{"schema_version":1,"layer":"power","reviewed_on":"2026-10-28","coverage_note":"Selected utility and state proceedings. Other utilities and states are not yet reviewed. One utility tariff does not establish statewide coverage. Current and earlier captured electricity comparisons retain separate periods and sources.","items":[{"id":"price-vt","kind":"residential_price","subject":"Vermont","state_codes":["vt"],"scope":"A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Residential comparison month.","locator":"Table heading"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Same month in the preceding year.","locator":"Table heading"},"price":{"value":23.75,"source_ids":["eia-prices"],"scope":"Preliminary residential state average, cents per kWh.","locator":"Residential July 2026, Vermont","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":22.14,"source_ids":["eia-prices"],"scope":"Residential state average for the comparison month.","locator":"Residential July 2025, Vermont","unit":"cents per kWh","measurement_role":"published_price"}}},{"id":"price-vt-202608","kind":"residential_price","subject":"Vermont","state_codes":["vt"],"scope":"Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.","fields":{"period":{"value":"August 2026","source_ids":["eia-residential-xlsx-20261023"],"scope":"Residential comparison month.","locator":"Table_5_06_A!B4:C4"},"prior_period":{"value":"August 2025","source_ids":["eia-residential-xlsx-20261023"],"scope":"Same month in the preceding year.","locator":"Table_5_06_A!B4:C4"},"price":{"value":23.84,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Preliminary August2026 residential state average, cents per kWh.","locator":"Table_5_06_A!B11:C11","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":22.1,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Final August2025 residential state average, cents per kWh.","locator":"Table_5_06_A!B11:C11","unit":"cents per kWh","measurement_role":"published_price"},"source_context":{"value":"The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.","source_ids":["eia-price-check-20261023-1645","eia-residential-xlsx-20261023"],"scope":"The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture.","locator":"HTML table heading and report header; spreadsheet rows1 through4 and67"}}},{"id":"tariff-bill-vt-h727-veto-20260529","kind":"tariff_legislation","state_codes":["vt"],"subject":"Vermont vetoed data center power framework","scope":"Historical vetoed bill with unsuccessful override. Proposed protections did not take effect through H727; this is not a review of current individual utility tariffs.","fields":{"vt_h727_veto_basis":{"value":"Vetoed bill with unsuccessful House override","source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Historical legislative outcome, not an enacted requirement or utility tariff approval.","locator":"Governor May28 announcement; House journal May29 page2399"},"status":{"value":"historical","source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed May28 and veto sustained May29. Proposed terms below did not take effect through H727; not currently pending, enacted or an approved utility tariff.","locator":"Official status; veto announcement; House journal2399"},"bill_version":{"value":"H727 as passed by House and Senate; readable VT LEG389783v1","source_ids":["vt-leg-h727-final-clean-20261024","vt-leg-h727-final-20261024"],"scope":"Legislature hosted Unofficial readable version checked against selected final inserted marked pages. Not a signed act.","locator":"Readable cover and footer; marked pages22,24,39"},"version_boundary":{"value":"Marked PDF pages1through10 and11through22 contain superseded blocks; final replacement starts on page22 and continues through39.","source_ids":["vt-leg-h727-final-20261024","vt-leg-h727-final-clean-20261024"],"scope":"Selected marked pages1and22 show visible deletion marks. Never merge earlier standalone tariff or siting language into the final contract provisions.","locator":"Marked pages1and22; readable pages1through5"},"vetoed_on":{"value":"2026-05-28","source_ids":["vt-governor-h727-veto-20260528-20261024"],"scope":"Governor returned bill unsigned and without approval. Enacting formula in bill text does not establish enactment.","locator":"Governor announcement"},"veto_sustained_on":{"value":"2026-05-29","source_ids":["vt-leg-h727-history-20261024","vt-house-journal-20260529-20261024"],"scope":"House declined to pass the bill notwithstanding the veto. This is a completed historical vote, not a scheduled hearing.","locator":"Official status; journal2399"},"override_vote":{"value":"Eighty three yes, fifty two no; ninety yes required among135votes. Override failed.","source_ids":["vt-house-journal-20260529-20261024"],"scope":"Yes meant pass notwithstanding the veto, not support for sustaining it. Majority support did not meet the stated two thirds threshold.","locator":"Journal2399 question and tally"},"governor_explanation":{"value":"Governor cited existing regulatory authority and concern about broader economic effects; suggested a substantially revised approach closer to the House version.","source_ids":["vt-governor-h727-veto-20260528-20261024"],"scope":"Attributed executive explanation, not independently established economic harm, quantified savings or a utility commission finding.","locator":"Governor veto letter"},"threshold":{"value":"Facility uses or is able to use20MWor more AND provides the specified data processing, hosting and related NAICS518210services.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Inclusive20MWcapability and activity definition, not only measured draw, a threshold above20MWor every industrial electricity customer. Vetoed proposal only.","locator":"Readable page1 proposed283"},"facility_aggregation":{"value":"Common ownership or control with a single, contiguous or adjacent site, OR nonadjacent sites functioning as one integrated operation through shared infrastructure or unified protocols under central management.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Nonadjacent aggregation is conditional; not automatic combination of every unrelated site or corporate portfolio. Vetoed proposal only.","locator":"Readable page2 proposed283"},"proposed_contract_review":{"value":"Data center electric service would require a PUC approved large load service equity contract.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Final vetoed proposal uses contract review. Not an actual approved contract or the earlier deleted standalone tariff schedule framework.","locator":"Readable page2 proposed284a"},"proposed_cost_allocation":{"value":"Equal or proportional service cost allocation, equitable embedded network contributions and insulation of other customer classes from data center deployment costs including generation, transmission, distribution, energy capacity and resource adequacy.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Proposed protection, not observed customer savings or proof a particular cost allocation was approved.","locator":"Readable pages2and3 proposed284b1and2"},"proposed_contract_length":{"value":"Minimum ten years, with service start date or estimated date stated in the contract.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Minimum duration, not exactly ten years, an executed agreement, actual start date or separately specified ramp period. Vetoed proposal only.","locator":"Readable page3 proposed284b3"},"proposed_minimum_payment":{"value":"Contract would specify a minimum amount OR percentage based on projected electricity usage for its duration.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"No numerical floor or universal demand versus energy formula supplied here; not a sixty percent minimum electric bill. Vetoed proposal only.","locator":"Readable page3 proposed284b4"},"proposed_excess_demand":{"value":"Reasonable charge for demand beyond the electricity demand projected when the contract is entered.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"No numerical price or executed charge established. Vetoed proposal only.","locator":"Readable page3 proposed284b5"},"proposed_collateral":{"value":"Collateral sufficient to prevent stranded cost risk.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"No fixed dollars, letter of credit term or credit grade established. Vetoed proposal only.","locator":"Readable page3 proposed284b6"},"proposed_curtailment":{"value":"Contract would address load curtailment procedures and priorities during grid emergencies.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Not proof of an actual curtailment, unconditional interruptible service or a universal compensation rate. Vetoed proposal only.","locator":"Readable page4 proposed284b8"},"proposed_findings":{"value":"Written reasoned PUC findings on general good, grid effects, economic benefit, resource plans, transmission and environmental justice.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Required findings in a vetoed proposal, not actual agency findings or demonstrated economic benefits.","locator":"Readable pages4and5 proposed284c"},"proposed_periodic_review":{"value":"Contract compliance reviews at intervals not exceeding two years, with earlier review allowed for good cause or public interest.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Review interval differs from minimum ten year contract; not automatic two year termination or an observed compliance review. Vetoed proposal only.","locator":"Readable page5 proposed284d"},"proposed_program_exclusions":{"value":"Specified energy savings accounts, customer credit and self managed energy efficiency programs would be unavailable to defined data centers.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Only listed programs, not every renewable incentive or a determination of present eligibility. Vetoed proposal only.","locator":"Readable page5 proposed284e"},"proposed_site_analysis":{"value":"Before a permit application, site suitability analysis in consultation with electric and efficiency utilities would assess building standards, renewable generation, storage, demand response and waste heat recovery capacity.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Preliminary capacity assessment, not mandatory installed heat recovery at every site or an actual permit application. Vetoed proposal only.","locator":"Readable page6 proposed285b"},"proposed_backup_generation":{"value":"Combustion backup limited to emergencies involving power failures or interruptions; otherwise prioritize storage and onsite renewables to the greatest extent practicable.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Covers combustion, not only natural gas. No explicit testing exception or fixed hours cap in reviewed subsection, installed generator count or actual emissions established. Vetoed proposal only.","locator":"Readable page7 proposed285c"},"proposed_renewables":{"value":"Maximize onsite renewable generation to the greatest extent technically feasible; directly polluting fuel combustion generation does not qualify unless it is a thermal energy plant.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Technical feasibility and thermal exception retained. Not an absolute100percent onsite generation obligation or built capacity. Vetoed proposal only.","locator":"Readable page7 proposed285d"},"proposed_environmental_attributes":{"value":"Renewable certificates or environmental attributes from plants constructed under the subsection would transfer to the electric company.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Proposed transfer, not evidence a developer retained or actually transferred credits. Vetoed proposal only.","locator":"Readable page7 proposed285d"},"proposed_transformation_payment":{"value":"Annual energy transformation fund payment equals60percent of prior calendar year electricity usage multiplied by the specified alternative compliance payment rate. Advance payment uses projected usage, reconciled in the next year.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"This separate proposed payment is not a60percent electric bill floor,60percent of dollar revenue or an actual payment. No total computed without usage and applicable rate. Vetoed proposal only.","locator":"Readable pages7and8 proposed285e"},"proposed_payment_location":{"value":"Fund would support energy transformation projects in host and surrounding communities to the extent practicable, with prorated credit for projects also supported by regulated entities.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Conditional location and credit allocation, not guaranteed local benefits or measured emissions reductions. Vetoed proposal only.","locator":"Readable page8 proposed285e"},"proposed_virtual_power_plant":{"value":"Participate in utility managed virtual power plant if available AND technically feasible; otherwise design and implement a coordinated self managed plant. Funding would be additional to the listed support programs.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Both conditions and fallback retained. Not an existing virtual plant, a physical central power station or an automatic exemption. Vetoed proposal only.","locator":"Readable pages8and9 proposed285f"},"proposed_quarterly_reports":{"value":"Reports begin within three months after operation, covering water and energy usage, daily peak usage and shared infrastructure payments, subject to public records inspection.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Proposed reporting clock, not observed usage or a report actually filed. Vetoed proposal only.","locator":"Readable page9 proposed286a"},"proposed_annual_report":{"value":"Department annual report beginning on or before January15,2028, provided at least one data center has entered the specified contract.","source_ids":["vt-leg-h727-final-clean-20261024"],"scope":"Conditional proposal, not unconditional January1deadline, a present calendar obligation or actual completed report. Vetoed proposal only.","locator":"Readable pages9and10 proposed286b"},"proposed_application":{"value":"Would cover data centers not operational at effect, and operational centers below20MWto the extent an expansion meets the statutory definition.","source_ids":["vt-leg-h727-final-clean-20261024","vt-leg-h727-final-20261024"],"scope":"Conditional expansion scope, not blanket exemption for every existing facility. The proposed effective date never became an effective date through H727.","locator":"Readable page18; marked page39 proposed section6"},"review_boundary":{"value":"Whole readable18page text read; power pages1through10and18 viewed, marked1/22/24/39 viewed, journalPDF17 printed2399 viewed, official history and veto announcement read.","source_ids":["vt-leg-h727-final-clean-20261024","vt-leg-h727-final-20261024","vt-house-journal-20260529-20261024","vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024"],"scope":"Sixteen selected PDF frames, not whole marked39page or whole223page journal visual review. No later PUC tariff inventory, individual contract, actual load, current statute inventory or operational compliance reviewed.","locator":"Retained originals and frame manifest"},"law_approved_on":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"law_effective_on":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"approved_on":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"effective_on":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"current_governing_tariff":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_contract_length":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"minimum_bill":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"collateral":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"exit_fees":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_load":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"approved_project_mw":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_service_on":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_security_payment":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_ratepayer_savings":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"individual_project_approval":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_virtual_power_plant":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_renewable_generation":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_transformation_payment":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"actual_water_withdrawal":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."},"atlas_record_id":{"value":null,"source_ids":["vt-leg-h727-history-20261024","vt-governor-h727-veto-20260528-20261024","vt-house-journal-20260529-20261024"],"scope":"Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome.","locator":"Legislative review boundary","unknown_reason":"Requires separate exact governing or observed evidence. H727 veto was sustained."}}},{"id":"tariff-vt-gmp-6365-oct2026","kind":"tariff","state_codes":["vt"],"subject":"Green Mountain Power general industrial time of use tariff","scope":"General utility context with conditional demand and voltage provisions. No project outcomes established.","fields":{"vt_gmp_6365_basis":{"value":"Posted general commercial and industrial time of use tariff.","source_ids":["vt-gmp-rates-20261024","vt-gmp-6365-tariff-20261024"],"scope":"GMP service territory only, not dedicated data center protections.","locator":"Heading"},"status":{"value":"program","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Posted utility context, not independent approval or complete current legal version.","locator":"Heading"},"utility":{"value":"Green Mountain Power","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific utility, not all Vermont utilities.","locator":"Heading"},"schedule":{"value":"Commercial and Industrial63/65, VPUC10","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Distinct from primary12 or transmission70.","locator":"Heading"},"threshold":{"value":"Required when average consumption during any four consecutive months is strictly greater than7600 kWh per month OR average actual demand during any four consecutive months is strictly greater than200 kW.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Four month averages and strict thresholds, not one peak, billing demand floor or200 MW.","locator":"Page1"},"source_difference":{"value":"Index says7600 kWh or more per month; tariff specifies four month average strictly greater than7600 kWh per month.","source_ids":["vt-gmp-rates-20261024","vt-gmp-6365-tariff-20261024"],"scope":"Different issuer wording preserved without converting strict tariff threshold to inclusive.","locator":"Index63/65 and tariff page1"},"transfer_conditions":{"value":"Remain at least twelve monthly billing periods, then unless consumption is less than6600 kWh AND billing demand less than150 kW during each of twelve consecutive months.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Both exit gates apply each month; entry actual demand differs from exit billing demand.","locator":"Page1"},"special_contract":{"value":"Special rates may be required for unique requirements imposing significant costs unrecovered by standard tariffs; subject to Vermont Public Utility Commission approval.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Conditional process, not an already approved customer contract or universal data center provision.","locator":"Page1"},"station_service":{"value":"Only primary use serving an offline generation facility qualifies: no peak Investment Charge, all periods offpeak for Investment Charge purposes; other charges and credits remain.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Not all backup generation, free energy or all charges waived.","locator":"Page1"},"customer_charge":{"value":"5.347 dollars per day.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Daily customer component only, not actual total bill.","locator":"Page2"},"demand_prices":{"value":"Peak21.038 dollars per kW; offpeak6.057 dollars per kW.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Separate demand components, schedule subject to adjustment.","locator":"Page2"},"energy_prices":{"value":"Peak0.14844 dollars per kWh; offpeak0.11281 dollars per kWh.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Energy components only, not complete bill.","locator":"Page2"},"peak_hours":{"value":"Utility selects sixteen consecutive hours between06:00 and23:00 on weekdays; all other times offpeak.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Not entire seventeen hour window or a known selected start time.","locator":"Page2"},"billing_demand":{"value":"Peak greatest current peak hours fifteen minute kW, not less than50 percent of highest fifteen minute peak in preceding eleven months peak periods.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Peak historical floor, not minimum energy or offpeak historical ratchet.","locator":"Page2"},"offpeak_demand":{"value":"Greatest fifteen minute kW during current month offpeak hours.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Current month measure distinct from peak history.","locator":"Page3"},"coincident_demand":{"value":"Utility may make same service location meters coincident and impose minimum demand for coincidentalized accounts; different business or service locations not coincident.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Discretionary treatment, not automatic portfolio aggregation.","locator":"Page3"},"power_factor":{"value":"Average power factor at least95 percent; below95 peak Investment Charge increases by ratio95 percent to actual power factor.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Peak Investment Charge only, not entire bill or fixed percent per point.","locator":"Page3"},"power_factor_waivers":{"value":"Utility may waive determination and billing for three phase demands less than100 kW; may assume95 percent for single phase and waive measurement.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Discretionary, not guaranteed or inclusive100 kW.","locator":"Page3"},"primary_discount":{"value":"4.00 percent on sum Investment and Energy charges with required customer owned and maintained equipment and delivery2.4 to34.5 kV.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Not full bill rebate; equipment obligations required.","locator":"Pages2 and3"},"secondary_meter_losses":{"value":"Secondary metering includes transformer losses; one transformer or bank not exceeding500 kVA may use factor1.03 on recorded kW and kWh.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Conditional upward adjustment, not discount or universal factor.","locator":"Page4"},"subtransmission_discount":{"value":"21.65 percent on sum Investment and Energy charges with required customer owned and maintained equipment and delivery33 to69 kV; secondary metering includes losses.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Conditional service and equipment requirements, not full bill discount.","locator":"Pages2 and4"},"large_subtransmission_discount":{"value":"Separate23.04 percent discount when monthly demand strictly greater than20 MW; subtransmission discount excludes primary metering discount.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Exactly20 MW does not qualify; discounts do not stack.","locator":"Pages2 and4"},"transformer_credit":{"value":"1.1302 dollars per greater peak or offpeak billing kW after all discounts when customer supplies all transformers OR uses delivery at least2300 V so utility provides none.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Conditional demand based credit, not fixed monthly amount or actual savings.","locator":"Pages2 and4"},"equipment_boundary":{"value":"Meter normally divides ownership unless utility opts otherwise; primary customer owns downstream primary equipment and transformation and maintains utility standards.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Obligation context, not installed equipment or paid construction.","locator":"Page5"},"meter_aggregation":{"value":"Total service normally one meter; combining multiple meters requires physically interconnected dependent simultaneous service or integral single operation; common ownership alone insufficient.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Not automatic aggregation of separate business units.","locator":"Page5"},"suspension_reconnection":{"value":"Reconnection less than twelve months after suspension retroactively bills minimum demand as if active each month back to suspension.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Strict less than twelve month condition; suspension does not erase obligation.","locator":"Page6"},"contract_length":{"value":"Initial term not less than one year, in writing if utility requires.","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Distinct from twelve monthly billing periods placement, not penalty free exit.","locator":"Page6"},"effective_on":{"value":"2026-10-01","source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Effective bills rendered on or after date; not reviewed approval day.","locator":"All page footers"},"approved_on":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"issued_on":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"current_governing_tariff":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"minimum_bill":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"collateral":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"exit_fees":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"individual_project_approval":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"individual_contract":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"actual_load":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"actual_energy":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"actual_bill":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"actual_ratepayer_savings":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."},"atlas_record_id":{"value":null,"source_ids":["vt-gmp-6365-tariff-20261024"],"scope":"Specific project actual or complete current governing obligation not established; peak demand floor separately retained.","locator":"Scope boundary and unreviewed complete service terms","unknown_reason":"Reviewed general tariff and index do not establish this outcome. Unknown is not zero, approval or absence."}}},{"id":"grid-isone-forecast-screening-20260518","kind":"grid_context","state_codes":["ct","me","ma","nh","ri","vt"],"subject":"New England dated large load forecast screening","scope":"Regional formal study and planning context, not current queue totals or operating data centers.","fields":{"isone_forecast_screen_basis":{"value":"Dated New England formal study proposals and screened planning forecast.","source_ids":["isone-large-load-forecast-news-20260518-20261024","isone-large-load-june2-20261024"],"locator":"May18article; June2slides4and5","scope":"Regional mixed large loads, not data center only requests or current interconnection queue."},"status":{"value":"historical","source_ids":["isone-large-load-forecast-news-20260518-20261024","isone-large-load-june2-20261024"],"locator":"May18article and June2deck","scope":"Dated forecast and proposal context, not project approval or operating status."},"snapshot_period":{"value":"May2026","source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Article dated May18","scope":"Month of published report; no exact date of underlying transmission owner survey inferred."},"proposal_context":{"value":"May18article reports two proposed large load projects in formal study, together at most285 MW.","source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Article survey paragraph","scope":"Potential demand upper bound, not approved connections, data center only capacity or current raw request inventory."},"later_rounded_context":{"value":"June2deck describes a few formal study projects below300 MW.","source_ids":["isone-large-load-june2-20261024"],"locator":"Slide5","scope":"Different dated rounded wording retained, not an increase, a new count or a replacement of earlier at most285 MW."},"forecast_entry":{"value":"Forecast includes projects at least20 MW with formal transmission study agreements.","source_ids":["isone-large-load-june2-20261024"],"locator":"Slide4","scope":"Both gates required. Not every early inquiry, all projects above20 MW or a new approved retail tariff threshold."},"forecast_adjustments":{"value":"Gather prospective load information with transmission owners, determine derate factors and effective nameplate, develop nameplate forecast and hourly usage profiles reflecting daily and calendar effects.","source_ids":["isone-large-load-june2-20261024"],"locator":"Slide4","scope":"Forecast method differs from raw nameplate or actual metered use."},"peak_forecast":{"value":"Article forecasts around110 MW contribution to summer and winter peaks in2030s, about130 MW in2040s.","source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Article peak forecast paragraph","scope":"Approximate forecast contributions, not285 MW raw proposals, current actual load or each state amount."},"near_term_wording":{"value":"May18article expects no overall demand effect before winter2027/2028; June2deck says minimal impact before2027/2028.","source_ids":["isone-large-load-forecast-news-20260518-20261024","isone-large-load-june2-20261024"],"locator":"Article; slide5","scope":"Dated expectations with different wording, not measured zero operating load or guaranteed start dates."},"energy_forecast":{"value":"Article describes annual energy around800 GWh from2030 to2035, around1000 GWh in2040s.","source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Article annual energy paragraph","scope":"Annual forecast wording, not cumulative six year energy or actual consumption. June2slide5 omits explicit annual label; no arithmetic sum."},"regional_scope":{"value":"New England regional context across Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont.","source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Regional scope","scope":"One shared regional amount, not six separate state totals, facility identities or statewide utility tariff reviews."},"source_review_boundary":{"value":"Whole May18article main text and seven page June2deck text read; only deck4and5frames inspected.","source_ids":["isone-large-load-forecast-news-20260518-20261024","isone-large-load-june2-20261024"],"locator":"Review scope","scope":"No individual project table in this deck, current CELT workbook, later tariff docket or underlying project agreement review."},"requested_capacity":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"current_requested_capacity":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"approved_capacity":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"actual_load":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"actual_energy":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"data_center_only_capacity":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"atlas_record_id":{"value":null,"source_ids":["isone-large-load-forecast-news-20260518-20261024"],"locator":"Scope boundary","scope":"Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join.","unknown_reason":"Reviewed historical forecast sources do not establish this current quantity or project outcome. Unknown is not zero, approval or absence."},"isone_celt_draft_scope":{"value":"March27,2026 deck is explicitly Final Draft. Physical slide14 lists NEMA data center200MW through2027 and Connecticut general electrification85MW through2040. Nameplate is before derating, mixed project types and regional zones, not285MW of operating data centers or a current request queue.","source_ids":["isone-celt2026-large-load-original"],"scope":"Dated final draft context, no individual site identity or current operating claim.","locator":"Physical slides1,6,14; slide14 visually reviewed"},"isone_celt_construction_boundary":{"value":"Slide14 says neither listed project was under construction in this dated snapshot and excludes them from winter2026/2027 and summer2026and2027 forecast periods. This historical screening assumption does not establish current construction status, a guaranteed completion date or measured zero load.","source_ids":["isone-celt2026-large-load-original"],"scope":"Dated final draft context, no individual site identity or current operating claim.","locator":"Physical slides1,6,14; slide14 visually reviewed"},"isone_celt_threshold_wording":{"value":"Slide6 says20MW or greater and a formal study agreement; slide14 says larger than20MW and a formal study agreement. Both original phrasings are retained without resolving exact20MW boundary eligibility or treating forecast screening as project approval.","source_ids":["isone-celt2026-large-load-original"],"scope":"Dated final draft context, no individual site identity or current operating claim.","locator":"Physical slides1,6,14; slide14 visually reviewed"}}},{"id":"sector-price-vt-202608","kind":"sector_price_context","subject":"Vermont commercial and industrial electricity prices","state_codes":["vt"],"scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","fields":{"period":{"value":"August 2026","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Current preliminary comparison month."},"prior_period":{"value":"August 2025","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Final same month previous year."},"sector_price_boundary":{"value":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A notes, including row67","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class."},"commercial_price":{"value":20.47,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!D11; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":19.05,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!E11; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":12.72,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!F11; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":12.05,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!G11; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":20.01,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Vermont All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":18.64,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Vermont All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"},"ytd_commercial_price":{"value":20.87,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!D11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_commercial_price":{"value":19.4,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!E11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_industrial_price":{"value":12.9,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!F11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_industrial_price":{"value":12.09,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!G11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_all_sector_price":{"value":20.28,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!J11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_all_sector_price":{"value":18.92,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!K11; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_period":{"value":"January through August 2026","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"prior_ytd_period":{"value":"January through August 2025","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"ytd_price_boundary":{"value":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"retail_sales_period":{"value":"August 2026","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_residential":{"value":187.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"187"},"retail_sales_residential_prior":{"value":186.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"186"},"retail_sales_commercial":{"value":183.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"183"},"retail_sales_commercial_prior":{"value":181.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"181"},"retail_sales_industrial":{"value":110.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"110"},"retail_sales_industrial_prior":{"value":109.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"109"},"retail_sales_transportation":{"value":0.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"retail_sales_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"retail_sales_all":{"value":481.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"481"},"retail_sales_all_prior":{"value":475.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Vermont row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"475"},"ytd_retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_sales_period":{"value":"January through August 2026","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_residential":{"value":1506.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"1,506"},"ytd_retail_sales_residential_prior":{"value":1512.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"1,512"},"ytd_retail_sales_commercial":{"value":1345.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"1,345"},"ytd_retail_sales_commercial_prior":{"value":1347.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"1,347"},"ytd_retail_sales_industrial":{"value":851.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"851"},"ytd_retail_sales_industrial_prior":{"value":844.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"844"},"ytd_retail_sales_transportation":{"value":0.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"ytd_retail_sales_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"ytd_retail_sales_all":{"value":3702.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,702"},"ytd_retail_sales_all_prior":{"value":3703.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Vermont row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,703"},"retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"retail_revenue_period":{"value":"August 2026","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_residential":{"value":45.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"45"},"retail_revenue_residential_prior":{"value":41.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"41"},"retail_revenue_commercial":{"value":37.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"37"},"retail_revenue_commercial_prior":{"value":34.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"34"},"retail_revenue_industrial":{"value":14.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"14"},"retail_revenue_industrial_prior":{"value":13.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"13"},"retail_revenue_transportation":{"value":0.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"retail_revenue_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"retail_revenue_all":{"value":96.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"96"},"retail_revenue_all_prior":{"value":89.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Vermont row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"89"},"ytd_retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_revenue_period":{"value":"January through August 2026","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_residential":{"value":361.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"361"},"ytd_retail_revenue_residential_prior":{"value":337.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"337"},"ytd_retail_revenue_commercial":{"value":281.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"281"},"ytd_retail_revenue_commercial_prior":{"value":261.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"261"},"ytd_retail_revenue_industrial":{"value":110.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"110"},"ytd_retail_revenue_industrial_prior":{"value":102.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"102"},"ytd_retail_revenue_transportation":{"value":0.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"ytd_retail_revenue_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"ytd_retail_revenue_all":{"value":751.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"751"},"ytd_retail_revenue_all_prior":{"value":700.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Vermont row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"700"},"retail_customers_basis":{"value":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Title,end-use headers and source notes"},"retail_customers_period":{"value":"August 2026","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_residential":{"value":314483,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column1","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"314,483"},"retail_customers_residential_prior":{"value":314906,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column2","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"314,906"},"retail_customers_commercial":{"value":65958,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column3","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"65,958"},"retail_customers_commercial_prior":{"value":64453,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column4","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"64,453"},"retail_customers_industrial":{"value":222,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column5","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"222"},"retail_customers_industrial_prior":{"value":228,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column6","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"228"},"retail_customers_transportation":{"value":0,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column7","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"0"},"retail_customers_transportation_prior":{"value":0,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column8","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"0"},"retail_customers_all":{"value":380663,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column9","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"380,663"},"retail_customers_all_prior":{"value":379587,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Vermont row,column10","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"379,587"}}},{"id":"sector-price-vt-202607","kind":"sector_price_context","subject":"Vermont historical commercial and industrial electricity prices","state_codes":["vt"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"sector_price_boundary":{"value":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"commercial_price":{"value":20.71,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Vermont commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":19.39,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Vermont prior_commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":13.07,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Vermont industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":12.23,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Vermont prior_industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":20.17,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Vermont All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":18.95,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Vermont All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"}}},{"id":"generation-vt-202608","subject":"Vermont utility scale generation","kind":"generation_context","state_codes":["vt"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A period and source notes"},"period":{"value":"August 2026","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"August 2025","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":176.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"176"},"prior_all_generation":{"value":110.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"110"},"published_generation_change":{"value":59.3,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"59.3%"},"utility_generation":{"value":76.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"76"},"prior_utility_generation":{"value":50.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"50"},"ipp_generation":{"value":100.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"100"},"prior_ipp_generation":{"value":60.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"60"},"commercial_generation":{"value":0.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0"},"prior_commercial_generation":{"value":0.05,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0.05"},"industrial_generation":{"value":0.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0"},"prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"August 2026","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"August 2025","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_all_generation":{"value":0.07,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.07"},"gas_published_generation_change":{"value":-100.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"-100.0%"},"gas_utility_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_utility_generation":{"value":0.05,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.05"},"gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_commercial_generation":{"value":0.02,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.02"},"gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"August 2026","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"August 2025","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_all_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_published_generation_change":{"value":null,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"August 2026","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"August 2025","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_published_generation_change":{"value":null,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"coal_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"August 2026","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"August 2025","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":20.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"20"},"wind_prior_all_generation":{"value":16.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"16"},"wind_published_generation_change":{"value":26.8,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"26.8%"},"wind_utility_generation":{"value":10.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"10"},"wind_prior_utility_generation":{"value":8.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"8"},"wind_ipp_generation":{"value":10.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"10"},"wind_prior_ipp_generation":{"value":8.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"8"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"August 2026","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"August 2025","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":80.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"80"},"hydro_prior_all_generation":{"value":17.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"17"},"hydro_published_generation_change":{"value":363.1,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"363.1%"},"hydro_utility_generation":{"value":24.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"24"},"hydro_prior_utility_generation":{"value":1.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"1"},"hydro_ipp_generation":{"value":56.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"56"},"hydro_prior_ipp_generation":{"value":17.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"17"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"August 2026","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"August 2025","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_published_generation_change":{"value":null,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"August 2026","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":82.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"82"},"solar_pv_prior_all_estimated_generation":{"value":56.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"56"},"solar_pv_published_generation_change":{"value":46.4,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"46.4%"},"solar_pv_utility_scale_generation":{"value":26.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"26"},"solar_pv_utility_scale_prior_generation":{"value":28.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"28"},"solar_pv_estimated_small_scale_generation":{"value":56.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"56"},"solar_pv_estimated_small_scale_prior_generation":{"value":28.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"28"},"solar_pv_electric_utilities_generation":{"value":7.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"7"},"solar_pv_electric_utilities_prior_generation":{"value":8.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"8"},"solar_pv_independent_producers_generation":{"value":19.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"19"},"solar_pv_independent_producers_prior_generation":{"value":21.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"21"},"solar_pv_commercial_estimated_total_generation":{"value":33.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"33"},"solar_pv_commercial_estimated_total_prior_generation":{"value":11.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"11"},"solar_pv_commercial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_commercial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_commercial_estimated_small_scale_generation":{"value":33.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"33"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":11.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"11"},"solar_pv_industrial_estimated_total_generation":{"value":0.37,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.37"},"solar_pv_industrial_estimated_total_prior_generation":{"value":0.21,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.21"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_estimated_small_scale_generation":{"value":0.37,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.37"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":0.21,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.21"},"solar_pv_residential_estimated_small_scale_generation":{"value":23.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"23"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":17.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Vermont row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"17"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"August 2026","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"August 2026","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"August 2025","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_all_generation":{"value":-0.11,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.11"},"other_energy_published_generation_change":{"value":-100.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"-100.0%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":-0.11,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.11"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"August 2026","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"August 2025","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"August 2026","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"August 2025","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":49.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"49"},"biomass_prior_all_generation":{"value":49.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"49"},"biomass_published_generation_change":{"value":0.2,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"0.2%"},"biomass_utility_generation":{"value":34.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"34"},"biomass_prior_utility_generation":{"value":34.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"34"},"biomass_ipp_generation":{"value":15.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"15"},"biomass_prior_ipp_generation":{"value":15.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"15"},"biomass_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_commercial_generation":{"value":0.03,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0.03"},"biomass_industrial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"August 2026","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_all_generation":{"value":0.17,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.17"},"petroleum_liquids_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_utility_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_utility_generation":{"value":0.17,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.17"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"August 2026","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"August 2026","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"August 2025","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_published_generation_change":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"August 2026","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"August 2025","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":95.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"95"},"nonhydro_prior_all_generation":{"value":93.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"93"},"nonhydro_published_generation_change":{"value":2.4,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"2.4%"},"nonhydro_utility_generation":{"value":51.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"51"},"nonhydro_prior_utility_generation":{"value":49.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"49"},"nonhydro_ipp_generation":{"value":44.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"44"},"nonhydro_prior_ipp_generation":{"value":44.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"44"},"nonhydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_prior_commercial_generation":{"value":0.03,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0.03"},"nonhydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"}}},{"id":"generation-vt-202608-ytd","subject":"Vermont utility scale generation","kind":"generation_context","state_codes":["vt"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B period and source notes"},"period":{"value":"January through August 2026","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"January through August 2025","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":1347.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,347"},"prior_all_generation":{"value":1522.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,522"},"published_generation_change":{"value":-11.5,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"-11.5%"},"utility_generation":{"value":560.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"560"},"prior_utility_generation":{"value":623.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"623"},"ipp_generation":{"value":786.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"786"},"prior_ipp_generation":{"value":897.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"897"},"commercial_generation":{"value":1.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1"},"prior_commercial_generation":{"value":1.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1"},"industrial_generation":{"value":0.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0"},"prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"0"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"January through August 2026","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":1.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1"},"gas_prior_all_generation":{"value":1.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1"},"gas_published_generation_change":{"value":34.7,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"34.7%"},"gas_utility_generation":{"value":0.49,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.49"},"gas_prior_utility_generation":{"value":0.19,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.19"},"gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_commercial_generation":{"value":0.44,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0.44"},"gas_prior_commercial_generation":{"value":1.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1"},"gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"January through August 2026","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_all_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_published_generation_change":{"value":null,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"January through August 2026","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_published_generation_change":{"value":null,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"coal_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"January through August 2026","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"January through August 2025","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":232.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"232"},"wind_prior_all_generation":{"value":259.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"259"},"wind_published_generation_change":{"value":-10.4,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"-10.4%"},"wind_utility_generation":{"value":120.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"120"},"wind_prior_utility_generation":{"value":131.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"131"},"wind_ipp_generation":{"value":113.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"113"},"wind_prior_ipp_generation":{"value":128.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"128"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"January through August 2026","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":655.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"655"},"hydro_prior_all_generation":{"value":802.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"802"},"hydro_published_generation_change":{"value":-18.3,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"-18.3%"},"hydro_utility_generation":{"value":218.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"218"},"hydro_prior_utility_generation":{"value":254.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"254"},"hydro_ipp_generation":{"value":438.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"438"},"hydro_prior_ipp_generation":{"value":548.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"548"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"January through August 2026","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"January through August 2025","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_published_generation_change":{"value":null,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"January through August 2026","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":519.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"519"},"solar_pv_prior_all_estimated_generation":{"value":341.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"341"},"solar_pv_published_generation_change":{"value":52.3,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"52.3%"},"solar_pv_utility_scale_generation":{"value":162.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"162"},"solar_pv_utility_scale_prior_generation":{"value":155.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"155"},"solar_pv_estimated_small_scale_generation":{"value":357.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"357"},"solar_pv_estimated_small_scale_prior_generation":{"value":186.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"186"},"solar_pv_electric_utilities_generation":{"value":41.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"41"},"solar_pv_electric_utilities_prior_generation":{"value":41.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"41"},"solar_pv_independent_producers_generation":{"value":121.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"121"},"solar_pv_independent_producers_prior_generation":{"value":113.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"113"},"solar_pv_commercial_estimated_total_generation":{"value":206.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"206"},"solar_pv_commercial_estimated_total_prior_generation":{"value":76.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"76"},"solar_pv_commercial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_commercial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_commercial_estimated_small_scale_generation":{"value":206.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"206"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":76.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"76"},"solar_pv_industrial_estimated_total_generation":{"value":2.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"2"},"solar_pv_industrial_estimated_total_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_estimated_small_scale_generation":{"value":2.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"2"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_residential_estimated_small_scale_generation":{"value":149.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"149"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":109.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Vermont row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"109"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"January through August 2026","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"January through August 2026","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_all_generation":{"value":-1.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-1"},"other_energy_published_generation_change":{"value":-100.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"-100.0%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":-1.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-1"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"January through August 2026","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"January through August 2026","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"January through August 2025","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":290.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"290"},"biomass_prior_all_generation":{"value":304.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"304"},"biomass_published_generation_change":{"value":-4.5,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"-4.5%"},"biomass_utility_generation":{"value":174.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"174"},"biomass_prior_utility_generation":{"value":195.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"195"},"biomass_ipp_generation":{"value":115.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"115"},"biomass_prior_ipp_generation":{"value":109.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"109"},"biomass_commercial_generation":{"value":1.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"1"},"biomass_prior_commercial_generation":{"value":1.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"1"},"biomass_industrial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_all_generation":{"value":3.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"3"},"petroleum_liquids_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_utility_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_utility_generation":{"value":3.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"3"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.00"},"petroleum_liquids_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.00"},"petroleum_liquids_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"January through August 2026","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_published_generation_change":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"January through August 2026","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":684.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"684"},"nonhydro_prior_all_generation":{"value":718.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"718"},"nonhydro_published_generation_change":{"value":-4.7,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"-4.7%"},"nonhydro_utility_generation":{"value":335.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"335"},"nonhydro_prior_utility_generation":{"value":367.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"367"},"nonhydro_ipp_generation":{"value":348.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"348"},"nonhydro_prior_ipp_generation":{"value":350.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"350"},"nonhydro_commercial_generation":{"value":1.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1"},"nonhydro_prior_commercial_generation":{"value":1.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1"},"nonhydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Vermont row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"}}},{"id":"capacity-state-utility-vt-202608","subject":"Vermont utility scale net summer capacity","kind":"capacity_context","state_codes":["vt"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","fields":{"utility_capacity_basis":{"value":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Title,technology headers and exclusions"},"utility_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"utility_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"status":{"value":"historical","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Dated source period"},"utility_capacity_renewables":{"value":717.2,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"717.2"},"utility_capacity_renewables_prior":{"value":715.7,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"715.7"},"utility_capacity_fossil":{"value":117.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"utility_capacity_fossil_prior":{"value":117.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"utility_capacity_pumped_storage":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_pumped_storage_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_storage":{"value":20.9,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20.9"},"utility_capacity_other_storage_prior":{"value":20.9,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20.9"},"utility_capacity_nuclear":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_nuclear_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_all":{"value":855.7,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"855.7"},"utility_capacity_all_prior":{"value":854.2,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Vermont row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"854.2"},"renew_capacity_basis":{"value":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Title,technology headers and exclusions"},"renew_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Dated source period"},"renew_capacity_wind":{"value":150.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"150.2"},"renew_capacity_wind_prior":{"value":150.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"150.2"},"renew_capacity_solar_pv":{"value":156.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"156.1"},"renew_capacity_solar_pv_prior":{"value":154.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"154.6"},"renew_capacity_solar_thermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_thermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_conventional_hydro":{"value":331.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"331.0"},"renew_capacity_conventional_hydro_prior":{"value":331.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"331.0"},"renew_capacity_biomass":{"value":79.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"79.9"},"renew_capacity_biomass_prior":{"value":79.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"79.9"},"renew_capacity_geothermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_geothermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_total_utility":{"value":717.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"717.2"},"renew_capacity_total_utility_prior":{"value":715.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"715.7"},"renew_capacity_small_pv_estimated":{"value":376.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column15","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"376.3"},"renew_capacity_small_pv_estimated_prior":{"value":184.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column16","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"184.9"},"renew_capacity_combined_pv_estimated":{"value":532.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column17","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"532.4"},"renew_capacity_combined_pv_estimated_prior":{"value":339.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column18","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"339.5"},"renew_capacity_combined_solar_estimated":{"value":532.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column19","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"532.4"},"renew_capacity_combined_solar_estimated_prior":{"value":339.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Vermont row,column20","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"339.5"},"fossil_capacity_basis":{"value":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Title,technology headers and exclusions"},"fossil_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Dated source period"},"fossil_capacity_gas_combined_cycle":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_gas_combined_cycle_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_gas_combustion_turbine":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_gas_combustion_turbine_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_gas_other":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_gas_other_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_coal":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_coal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_coke":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_coke_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_liquids":{"value":117.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"fossil_capacity_petroleum_liquids_prior":{"value":117.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"fossil_capacity_other_fossil_gas":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_other_fossil_gas_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_total":{"value":117.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column15","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"fossil_capacity_total_prior":{"value":117.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Vermont row,column16","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"117.6"},"reported_planned_unit_rows":{"value":5,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_planned_utility_unit_rows"},"reported_planned_unit_capacity_sum":{"value":108.0,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_net_summer_capacity"},"reported_planned_unit_nameplate_sum":{"value":108.0,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_nameplate_capacity"},"reported_planned_unit_complete_nonoperating_rows":{"value":0,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_complete_nonoperating_planned_units"},"reported_planned_unit_basis":{"value":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary"}}},{"id":"power-ieee-reliability-2025-vt","kind":"reliability_context","subject":"Vermont historical IEEE distribution reliability2025 and2024","state_codes":["vt"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 years2025 and2024"},"ieee_reliability_basis":{"value":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 header and definitions"},"ieee_coverage_2025":{"value":10.8,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;coverage;Year 2025","source_token":"10.8%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_coverage_2024":{"value":10.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;coverage;Year 2024","source_token":"10.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2025":{"value":251.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_saidi;Year 2025","source_token":"251.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2024":{"value":895.8,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_saidi;Year 2024","source_token":"895.8","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2025":{"value":2.06,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_saifi;Year 2025","source_token":"2.06","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2024":{"value":3.34,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_saifi;Year 2024","source_token":"3.34","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2025":{"value":122.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_caidi;Year 2025","source_token":"122","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2024":{"value":268.2,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;all_events_caidi;Year 2024","source_token":"268.2","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2025":{"value":150.6,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_saidi;Year 2025","source_token":"150.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2024":{"value":231.8,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_saidi;Year 2024","source_token":"231.8","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2025":{"value":1.45,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_saifi;Year 2025","source_token":"1.45","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2024":{"value":1.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_saifi;Year 2024","source_token":"1.4","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2025":{"value":103.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_caidi;Year 2025","source_token":"103.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2024":{"value":165.6,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;without_major_days_caidi;Year 2024","source_token":"165.6","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2025":{"value":242.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_saidi;Year 2025","source_token":"242.9","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2024":{"value":884.6,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_saidi;Year 2024","source_token":"884.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2025":{"value":1.42,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_saifi;Year 2025","source_token":"1.42","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2024":{"value":2.06,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_saifi;Year 2024","source_token":"2.06","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2025":{"value":171.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_caidi;Year 2025","source_token":"171.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2024":{"value":429.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Vermont row;loss_supply_removed_caidi;Year 2024","source_token":"429.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_ieee_all_events_2023":{"value":486.3,"source_token":"486.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2022":{"value":914.6,"source_token":"914.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2021":{"value":215.3,"source_token":"215.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2020":{"value":158.4,"source_token":"158.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2019":{"value":334.0,"source_token":"334","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2018":{"value":929.8,"source_token":"929.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2017":{"value":1792.4,"source_token":"1792.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2016":{"value":198.8,"source_token":"198.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2015":{"value":193.4,"source_token":"193.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2023":{"value":204.3,"source_token":"204.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2022":{"value":178.5,"source_token":"178.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2021":{"value":215.3,"source_token":"215.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2020":{"value":158.4,"source_token":"158.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2019":{"value":170.4,"source_token":"170.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2018":{"value":357.7,"source_token":"357.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2017":{"value":186.2,"source_token":"186.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2016":{"value":198.8,"source_token":"198.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2015":{"value":193.4,"source_token":"193.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2023":{"value":480.1,"source_token":"480.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2022":{"value":877.6,"source_token":"877.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2021":{"value":210.1,"source_token":"210.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2020":{"value":151.0,"source_token":"151","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2019":{"value":329.4,"source_token":"329.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2018":{"value":732.1,"source_token":"732.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2017":{"value":1782.7,"source_token":"1782.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2016":{"value":187.4,"source_token":"187.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2015":{"value":179.4,"source_token":"179.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_ieee_all_events_2023":{"value":2.25,"source_token":"2.25","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2022":{"value":2.44,"source_token":"2.44","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2021":{"value":1.91,"source_token":"1.91","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2020":{"value":1.63,"source_token":"1.63","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2019":{"value":1.96,"source_token":"1.96","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2018":{"value":3.39,"source_token":"3.39","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2017":{"value":2.609,"source_token":"2.609","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2016":{"value":1.552,"source_token":"1.552","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2015":{"value":1.765,"source_token":"1.765","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2023":{"value":1.38,"source_token":"1.38","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2022":{"value":1.95,"source_token":"1.95","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2021":{"value":1.91,"source_token":"1.91","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2020":{"value":1.63,"source_token":"1.63","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2019":{"value":1.49,"source_token":"1.49","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2018":{"value":2.34,"source_token":"2.34","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2017":{"value":1.632,"source_token":"1.632","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2016":{"value":1.552,"source_token":"1.552","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2015":{"value":1.765,"source_token":"1.765","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2023":{"value":2.04,"source_token":"2.04","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2022":{"value":2.26,"source_token":"2.26","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2021":{"value":1.75,"source_token":"1.75","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2020":{"value":1.56,"source_token":"1.56","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2019":{"value":1.9,"source_token":"1.9","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2018":{"value":2.86,"source_token":"2.86","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2017":{"value":2.491,"source_token":"2.491","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2016":{"value":1.372,"source_token":"1.372","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2015":{"value":1.531,"source_token":"1.531","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_ieee_all_events_2023":{"value":216.1,"source_token":"216.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2022":{"value":374.8,"source_token":"374.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2021":{"value":112.7,"source_token":"112.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2020":{"value":97.2,"source_token":"97.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2019":{"value":170.4,"source_token":"170.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2018":{"value":274.3,"source_token":"274.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2017":{"value":687.1,"source_token":"687.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2016":{"value":128.1,"source_token":"128.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2015":{"value":109.6,"source_token":"109.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2023":{"value":148.1,"source_token":"148.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2022":{"value":91.5,"source_token":"91.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2021":{"value":112.7,"source_token":"112.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2020":{"value":97.2,"source_token":"97.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2019":{"value":114.4,"source_token":"114.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2018":{"value":152.8,"source_token":"152.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2017":{"value":114.1,"source_token":"114.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2016":{"value":128.1,"source_token":"128.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2015":{"value":109.6,"source_token":"109.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_without_major_days;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2023":{"value":235.3,"source_token":"235.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2022":{"value":388.3,"source_token":"388.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2021":{"value":120.1,"source_token":"120.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2020":{"value":96.8,"source_token":"96.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2019":{"value":173.4,"source_token":"173.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2018":{"value":256.0,"source_token":"256","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2017":{"value":715.5,"source_token":"715.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2016":{"value":136.6,"source_token":"136.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2015":{"value":117.2,"source_token":"117.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}},{"id":"power-any-reliability-2025-vt","kind":"reliability_context","subject":"Vermont historical any-method distribution reliability2025 and2024","state_codes":["vt"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 years2025 and2024"},"any_reliability_basis":{"value":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 header and definitions"},"any_coverage_2025":{"value":89.8,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;coverage;Year 2025","source_token":"89.8%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_coverage_2024":{"value":87.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;coverage;Year 2024","source_token":"87.0%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2025":{"value":262.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_saidi;Year 2025","source_token":"262.9","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2024":{"value":696.7,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_saidi;Year 2024","source_token":"696.7","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2025":{"value":1.697,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_saifi;Year 2025","source_token":"1.697","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2024":{"value":2.516,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_saifi;Year 2024","source_token":"2.516","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2025":{"value":154.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_caidi;Year 2025","source_token":"154.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2024":{"value":276.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;all_events_caidi;Year 2024","source_token":"276.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2025":{"value":184.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_saidi;Year 2025","source_token":"184.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2024":{"value":275.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_saidi;Year 2024","source_token":"275","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2025":{"value":1.563,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_saifi;Year 2025","source_token":"1.563","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2024":{"value":1.661,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_saifi;Year 2024","source_token":"1.661","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2025":{"value":118.1,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_caidi;Year 2025","source_token":"118.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2024":{"value":165.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Vermont row;without_major_events_caidi;Year 2024","source_token":"165.5","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_any_all_events_2023":{"value":744.4,"source_token":"744.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2022":{"value":963.5,"source_token":"963.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2021":{"value":313.2,"source_token":"313.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2020":{"value":255.6,"source_token":"255.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2019":{"value":443.8,"source_token":"443.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2018":{"value":897.6,"source_token":"897.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2017":{"value":873.9,"source_token":"873.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2016":{"value":359.4,"source_token":"359.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2015":{"value":204.2,"source_token":"204.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2023":{"value":221.3,"source_token":"221.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2022":{"value":267.6,"source_token":"267.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2021":{"value":262.4,"source_token":"262.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2020":{"value":255.6,"source_token":"255.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2019":{"value":170.1,"source_token":"170.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2018":{"value":262.1,"source_token":"262.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2017":{"value":246.4,"source_token":"246.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2016":{"value":273.2,"source_token":"273.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2015":{"value":205.6,"source_token":"205.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Vermont row;any_without_major_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_any_all_events_2023":{"value":2.352,"source_token":"2.352","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2022":{"value":2.62,"source_token":"2.62","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2021":{"value":2.074,"source_token":"2.074","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2020":{"value":1.898,"source_token":"1.898","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2019":{"value":1.981,"source_token":"1.981","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2018":{"value":2.619,"source_token":"2.619","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2017":{"value":2.413,"source_token":"2.413","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2016":{"value":1.862,"source_token":"1.862","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2015":{"value":1.67,"source_token":"1.67","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2023":{"value":1.58,"source_token":"1.58","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2022":{"value":1.967,"source_token":"1.967","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2021":{"value":2.058,"source_token":"2.058","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2020":{"value":1.926,"source_token":"1.926","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2019":{"value":1.465,"source_token":"1.465","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2018":{"value":1.908,"source_token":"1.908","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2017":{"value":1.889,"source_token":"1.889","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2016":{"value":1.8,"source_token":"1.8","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2015":{"value":1.748,"source_token":"1.748","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Vermont row;any_without_major_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_any_all_events_2023":{"value":316.5,"source_token":"316.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2022":{"value":367.8,"source_token":"367.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2021":{"value":151.0,"source_token":"151","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2020":{"value":134.7,"source_token":"134.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2019":{"value":224.0,"source_token":"224","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2018":{"value":342.8,"source_token":"342.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2017":{"value":362.1,"source_token":"362.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2016":{"value":193.1,"source_token":"193.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2015":{"value":122.3,"source_token":"122.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2023":{"value":140.0,"source_token":"140","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2022":{"value":136.0,"source_token":"136","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2021":{"value":127.5,"source_token":"127.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2020":{"value":132.7,"source_token":"132.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2019":{"value":116.2,"source_token":"116.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2018":{"value":137.4,"source_token":"137.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2017":{"value":130.4,"source_token":"130.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2016":{"value":151.8,"source_token":"151.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2015":{"value":117.6,"source_token":"117.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Vermont row;any_without_major_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}}],"sources":{"eia-prices":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"Electric Power Monthly, table 5.6.A","publisher":"U.S. Energy Information Administration","published_on":"2026-09-24","date_note":null,"checked_at":"2026-10-23T11:36:34.899891+00:00","sha256":"17ebeca2c90f3f0e5aa41062a2f90952c8ffdf396479281ce6b363ef2fcc1b90","scope":"Captured public table compares July 2026 and July 2025 residential average prices. Preliminary estimates, not bills or data center cost attribution. The next scheduled release is not treated as available.","tier":"A","establishes_status":[],"additional_review_scope":"October26additionalreview of retainedJulycommercialandindustrialcolumns,51states/DC. Originalresidentialscope,clocks,releaseidentityandhashpreserved;no newsourcecapture."},"eia-price-check-20261023-1645":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA table5.6.A August2026 and2025 public HTML capture","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:45:07.936393+00:00","sha256":"fbfc4385f5613eb8d2b118ef2603bd81d1162f33e5ffda2dc8f03a1a3bfeb813","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"eia-residential-xlsx-20261023":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A August2026 and2025 public spreadsheet","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:47:20.189135+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"vt-leg-h727-history-20261024":{"url":"https://legislature.vermont.gov/bill/status/2026/H.727","title":"Vermont H727 official bill status","publisher":"Vermont General Assembly","published_on":null,"date_note":"Changing bill page checked October24,2026; May29 last recorded action is not its original publication date.","scope":"Official last recorded action, not an inventory of all Vermont utility tariffs.","checked_at":"2026-10-24T17:33:31.722334+00:00","sha256":"ba3adfec1edced3fefd621d67a090750360095e5ea88733af2ca5757e5399056","tier":"A","establishes_status":["historical"]},"vt-governor-h727-veto-20260528-20261024":{"url":"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026","title":"Vermont Governor H727 veto announcement","publisher":"Office of Governor Phil Scott","published_on":"2026-05-28","date_note":"Agency press release dated May28,2026.","scope":"Actual gubernatorial veto and attributed reasons, not a PUC tariff decision.","checked_at":"2026-10-24T17:33:32.612829+00:00","sha256":"7eff7777155b18ae2b48a872247613edf7e969d396d1b4760e9a5e4e0bab5766","tier":"A","establishes_status":["historical"]},"vt-leg-h727-final-20261024":{"url":"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Official.pdf","title":"Vermont H727 final bill with amendment markings","publisher":"Vermont General Assembly","published_on":null,"date_note":"Final bicameral bill text; exact publication day not printed in selected pages.","scope":"Selected marked pages distinguish superseded blocks from final inserted text. Not an enacted law.","checked_at":"2026-10-24T17:33:49.614722+00:00","sha256":"0694d66fd70bd40fffda3d6f48f0ec011d64233236368ee57831299ebc264279","tier":"A","establishes_status":[]},"vt-leg-h727-final-clean-20261024":{"url":"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf","title":"Vermont H727 final bicameral bill readable version","publisher":"Vermont General Assembly","published_on":null,"date_note":"Legislature labels link Unofficial; document identifies AS PASSED BY HOUSE AND SENATE, VT LEG389783v1. Original publication day unknown.","scope":"Official legislature hosted readable bill with final text, not an enacted law. Whole text read; power pages1through10and18 viewed.","checked_at":"2026-10-24T17:34:22.361371+00:00","sha256":"b61f5e9a039b2b6f14c7c06486e33fa4e7cf1bc9d1ae57e669964f19aa49975e","tier":"A","establishes_status":[]},"vt-house-journal-20260529-20261024":{"url":"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf","title":"Vermont House journal May29 H727 override vote","publisher":"Vermont General Assembly","published_on":null,"date_note":"Journal dated May29,2026. Original web publication day unknown.","scope":"PDFpage17, printed2399, records the unsuccessful override question and threshold. Full223page journal not reviewed.","checked_at":"2026-10-24T17:33:50.200807+00:00","sha256":"55d8cfea87d8cb4631ef7257d9f17d2c27a78778a9e6cf3d97904b3765843ac3","tier":"A","establishes_status":["historical"]},"vt-gmp-rates-20261024":{"url":"https://greenmountainpower.com/rates/","title":"Green Mountain Power rate index","publisher":"Green Mountain Power","published_on":null,"date_note":"Publication and issue days unknown. Printed October1,2026 bill effect differs from approval.","scope":"Rate63/65 section and direct tariff link reviewed; other schedules not fully reviewed.","checked_at":"2026-10-24T20:20:47.225782+00:00","sha256":"4d02089d9842b232c8cd0081b96ded0cf77ddc812f3508765405515bd70494c2","tier":"A","establishes_status":["program"]},"vt-gmp-6365-tariff-20261024":{"url":"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf","title":"Green Mountain Power general commercial and industrial63/65 tariff","publisher":"Green Mountain Power","published_on":null,"date_note":"Publication and issue days unknown. Printed October1,2026 bill effect differs from approval.","scope":"Whole six page tariff text read and six rendered frames inspected; underlying orders and complete service terms unreviewed.","checked_at":"2026-10-24T20:20:54.949302+00:00","sha256":"ab5028469daec232edd65396618b1cdecff76d0a0836f49e55bf1438c23fdba5","tier":"A","establishes_status":["program"]},"isone-large-load-forecast-news-20260518-20261024":{"url":"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/","title":"ISO New England forecast framework announcement","publisher":"ISO New England","published_on":"2026-05-18","date_note":"Article explicitly dated May18,2026; deck printed June2meeting day is separate from exact original publication day, unknown.","scope":"Whole May18article main text read; no underlying CELT workbook review.","checked_at":"2026-10-24T21:20:48.559486+00:00","sha256":"846be2a4ed17f78a74aeb4ec6c89d8c8168559ff7ef14e4129935858d5a6e9e1","tier":"A","establishes_status":["historical"]},"isone-large-load-june2-20261024":{"url":"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf","title":"ISO New England June2large load planning presentation","publisher":"ISO New England","published_on":null,"date_note":"Article explicitly dated May18,2026; deck printed June2meeting day is separate from exact original publication day, unknown.","scope":"Seven page deck text read, only4and5frames viewed. No individual project table or later current tariff review.","checked_at":"2026-10-24T21:21:00.580013+00:00","sha256":"2bb0c9d5db564c8c930050fdde611abd4c3baed6336334e31965aad74d69de4d","tier":"A","establishes_status":["historical"]},"isone-celt2026-large-load-original":{"url":"https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf","title":"Final draft2026 New England large load forecast","publisher":"ISO New England","published_on":null,"date_note":"Cover dated March27,2026 and explicitly Final Draft; date is document date, not established exact web publication or final adoption date.","scope":"Physical slide14 table visually reviewed; text on slides1,6,14 reviewed. No whole deck graphical review, current queue or individual project agreement review.","checked_at":"2026-10-26T01:06:12.033727+00:00","sha256":"1e6957c4d60d705d5e9c21671c18786072eafb325846489386a60dd54ff045cf","tier":"A","establishes_status":["historical"]},"eia-sector-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A commercial and industrial state comparisons","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.117925+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","tier":"A","establishes_status":["historical"]},"eia-sector-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA August2026 price table and released report header","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.563354+00:00","sha256":"fd9538a038063f2ad2d62d799c6616392150c100da2e27001b409a7db61e43c0","tier":"A","establishes_status":["historical"]},"eia-ytd-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:57.123492+00:00","sha256":"bddeeb6e562bf3c982d11ad990d3ea22285275d7d5a75b54039e19757876994e","tier":"A","establishes_status":["historical"]},"eia-ytd-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:38.218526+00:00","sha256":"8c7409cacc21048b831d96d094400d3a7b2bbac0d4cbd78e84c3d4c99b334a29","tier":"A","establishes_status":["historical"]},"eia-state-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a","title":"EIA Electric Power Monthly Table1.3.A, utility scale facility net generation by state and sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:26:58.495431+00:00","sha256":"9a89406a41427b37eda8d8f18d214983c7f51834ebceeb528cdfdb4244f09990","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-net-generation-aug2026.html","tier":"A","scope":"Complete51state/DC utility scale generation rows, not Census division totals or USaggregate. August2026 preliminary versusAugust2025 final;commercial/industrial generator classification is not customer electricity use.","establishes_status":["historical"]},"eia-state-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b","title":"EIA Electric Power Monthly Table1.3.B utility scale facility net generation by state and sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:55:44.858242+00:00","sha256":"c8ba76926634a47f369116b1c7820b084eabb24d7d5f83bd1a4683a703f825d6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulative January throughAugust2026/2025 generation rows, not monthlyAugust, annualtotals orCensusdivision/USaggregates. Generatorsectors notcustomeruse.","establishes_status":["historical"]},"eia-state-gas-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a","title":"EIA Electric Power Monthly Table1.7.A utility scale facility net generation from natural gas by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:25:59.736250+00:00","sha256":"6a32013bfbe60c7bb68a2c80aeadb72b7dd57a7f66a64e835f1ef62beff2fa3e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-aug2026.html","tier":"A","scope":"Whole51state/DC list for natural gas fuel generation only. Not gasproduction/fuelconsumption/allfuelgeneration ordata-center electricityfuelmix. NM/-- andnegativezero source markers retained.","establishes_status":["historical"]},"eia-state-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b","title":"EIA Electric Power Monthly Table1.7.B utility scale facility net generation from natural gas by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:55:48.321070+00:00","sha256":"c306bd11fb76bc034b474ed8f06f7c29000d2b93b10afe14ee9a3563220db80c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug naturalgas generation rows,notmonthlyAugust/annualtotals,gasproduction/fuelconsumption ordata-centerfuelmix. Publishedpercentagescalculatedbeforerounding;NMand--retainliteralmeaning.","establishes_status":["historical"]},"eia-state-nuclear-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a","title":"EIA Electric Power Monthly Table1.9.A utility scale facility net generation from nuclear energy by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:25:41.261720+00:00","sha256":"ae346eb0bc5140a0fe5e38187badd5ce334c10c1468707f4af5147d56dacdb28","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-aug2026.html","tier":"A","scope":"Complete51state/DC nuclear generation rows,not installedcapacity/plantinventory,customerdemand,deliveredpowerfuelmix or emissions. Preliminary2026/final2025;sourcepercentagecalculatedbeforerounding. Zero generation notabsenceofnuclearcapacity.","establishes_status":["historical"]},"eia-state-nuclear-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b","title":"EIA Electric Power Monthly Table1.9.B utility scale facility net generation from nuclear energy by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:55:38.727441+00:00","sha256":"159560c5a77a375a4c2f3ebb7aab21c2ecfb013d23fa7baa0781eddf7e642471","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug nuclear netgeneration rows,notmonthlyAugust/annualtotals,capacity/plantinventory or data-center deliveredfuelmix. Preliminary2026/final2025;publishedpercentagebeforerounding,zero notplantabsence.","establishes_status":["historical"]},"eia-state-coal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a","title":"EIA Electric Power Monthly Table1.4.A August2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.500962+00:00","sha256":"fc35026730bc070c8b0094d7394bd496c2fed4e09aa42688371d0ca1a1246495","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;monthlyAugust notYTD;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-coal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b","title":"EIA Electric Power Monthly Table1.4.B cumulativeJanuarythroughAugust2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.859775+00:00","sha256":"69316d2a9768e8ff9285da375c444eb7b187c4caefbda6d753bf9cbbc5dca9d3","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;cumulativeYTD notmonthly/annual;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-wind-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a","title":"EIA Electric Power Monthly Table1.14.A August2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.206920+00:00","sha256":"e58a6e19a58949e89669f6a56b58918418a443c305a4ac8bcc1d37417abcb437","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;monthAugust notYTD;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-wind-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b","title":"EIA Electric Power Monthly Table1.14.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.511460+00:00","sha256":"ea80ce88a0eb5af674faa0e89b52b7a03a1af2fe547f6750160c5c895281a03c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;cumulativeYTD notmonth/annual;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-hydro-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a","title":"EIA Electric Power Monthly Table1.10.A August2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:06.432055+00:00","sha256":"9e12df2bd7d252a9fa01d46fc8457ba8ad61319a7eab99f9314316b04c3b3589","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;monthAugust notYTD;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-hydro-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b","title":"EIA Electric Power Monthly Table1.10.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:07.032975+00:00","sha256":"4b7f8c5f24097203262594ab1a5943139918233f3fe99b4eec3c6c40f7ec4565","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;cumulativeYTD notmonth/annual;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-pumped-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a","title":"EIA Electric Power Monthly Table1.12.A August2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.178196+00:00","sha256":"f47cb6a724ad141bfef77dd1b93133635b60b03ef6f373012aeee441f3fd250b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;month notYTD;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-pumped-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b","title":"EIA Electric Power Monthly Table1.12.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.535361+00:00","sha256":"7adac72989762f18b744568df6258ad9a8ef9c26b3e6b3acee36d31948f85ec2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;YTD notmonth/annual;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-solar-pv-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a","title":"EIA Electric Power Monthly Table1.17.A solar photovoltaic state net generation: utility scale and estimated small scale, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.274803+00:00","sha256":"527d6c8a60272658c71f308929e0f68ee652fd8c922947fe574963371e6f2b56","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-month-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-pv-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b","title":"EIA Electric Power Monthly Table1.17.B solar photovoltaic state net generation: utility scale and estimated small scale, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.616834+00:00","sha256":"6f6fce2d81012f27d144838cc41d611e8d7e5b75c472289c064f1934cdf6be4c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-ytd-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a","title":"EIA Electric Power Monthly Table1.18.A solar thermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.602781+00:00","sha256":"9741f9ca822bd33c5ed8414f2dc95dcfa451ac39975a3207e188104d9303f7aa","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b","title":"EIA Electric Power Monthly Table1.18.B solar thermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.899676+00:00","sha256":"522fb2bee7cace3160be662d153680672e3d07c3494ac1882b71561f7514e22e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-other-energy-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a","title":"EIA Electric Power Monthly Table1.13.A Other Energy Sources utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.215156+00:00","sha256":"b8589b23d096be4e03c11bedffc6d7af0bed5fa2ec64fa89e2f21624909cc7b6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-other-energy-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b","title":"EIA Electric Power Monthly Table1.13.B Other Energy Sources utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.437082+00:00","sha256":"cc0d7f4a0db49596101f43d4cd1103a6b80dcb399ed620f52157ffa31e28269c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-geothermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a","title":"EIA Electric Power Monthly Table1.16.A Geothermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:37.792695+00:00","sha256":"430765fda25b13841593833228c799f768849344f4e4645d5c29783c76b3a310","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-geothermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b","title":"EIA Electric Power Monthly Table1.16.B Geothermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:38.021096+00:00","sha256":"02b888bc082f02e9a803e89552c180df37b090ac4bb92376bcc69f668a9bc109","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a","title":"EIA Electric Power Monthly Table1.15.A Biomass utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:40.960261+00:00","sha256":"1f5e6b6e275bacc2d88c3d2692efda69e80284e71dddfd1e5caca84dffae92d4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b","title":"EIA Electric Power Monthly Table1.15.B Biomass utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:41.153412+00:00","sha256":"f3f3f854afa04798193429529b13e82f74000ac95e7d1a2a12aa51662437eca2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a","title":"EIA Electric Power Monthly Table1.5.A Petroleum Liquids utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.484512+00:00","sha256":"a23eb87738ca68822004a0426eed58a8ea1b0ee0f5ae96170253a31cbd18942f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b","title":"EIA Electric Power Monthly Table1.5.B Petroleum Liquids utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.728254+00:00","sha256":"5ee9f2be2884f3e256ce2a3e02c8270753ab2e5d7ab0507d54250638c00487a8","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a","title":"EIA Electric Power Monthly Table1.6.A Petroleum Coke utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.070566+00:00","sha256":"64935012da6e62146d74425ac1c830a9c62e840901393f03f3ad363dad2f9d17","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b","title":"EIA Electric Power Monthly Table1.6.B Petroleum Coke utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.279055+00:00","sha256":"1e09b99b06270a93a8293578b1e47c67dcdddf03959878851a1ac453f2202f80","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a","title":"EIA Electric Power Monthly Table1.8.A Other Fossil Gas utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:42.932701+00:00","sha256":"ebc1838c0d9e26e1884695c95399f2793f7fa08d6de5762f9ab8c0a5daebda9c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b","title":"EIA Electric Power Monthly Table1.8.B Other Fossil Gas utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:43.279403+00:00","sha256":"b273bf54a3b99a153e08448d69e5e56cf5496cc792125e6a73f9e4e915a27104","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a","title":"EIA Electric Power Monthly Table1.11.A Renewable Sources Excluding Hydroelectric utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.156505+00:00","sha256":"d98e7e79804a0ccd737e9ac399f64c210a141f7df3200368f3a2b0a6433f6f00","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b","title":"EIA Electric Power Monthly Table1.11.B Renewable Sources Excluding Hydroelectric utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.340447+00:00","sha256":"3d4249d5d441323d0849b1fdb08845cb45ee2587311b84364aa75d52f0dce665","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-retail-sales-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a","title":"EIA Electric Power Monthly Table5.4.A Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.155248+00:00","sha256":"f289ad1eb2b68b07f015bb846f8c19135fbbe9ff4a5aabead8de9796c354212f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-month-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-sales-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b","title":"EIA Electric Power Monthly Table5.4.B Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.440305+00:00","sha256":"836b3186730666bcf3a4adcbe5fd29931786fffc3cd5663f22dfde4ee2389243","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-ytd-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a","title":"EIA Electric Power Monthly Table5.5.A Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:48.417748+00:00","sha256":"67b465253fdf956455755bd3ca342eeee983672af9cf883ec12fc3bdacd8eba6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-month-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b","title":"EIA Electric Power Monthly Table5.5.B Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:49.025316+00:00","sha256":"f3630914ac0a13920af8b7afad9e321630c90d87731b7ca06b278312db06273b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-ytd-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-customers-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08","title":"EIA Electric Power Monthly Table5.8 Number of Ultimate Customers Served by Sector by State:August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T17:01:56.921729+00:00","sha256":"94daef9ec234f1151524adbc5a5a221aeaccc71a48d1c117663f50a52a89d2b7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-customers-aug2026.html","tier":"A","scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","establishes_status":["historical"]},"eia-state-utility-capacity-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a","title":"EIA Electric Power Monthly Table6.2.A Net Summer Capacity of Utility Scale Units by Technology and State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:03:55.269501+00:00","sha256":"489bfa1db54aa8bebb976a2f1f0e9e6f85076837cdb16b785ce7727484a41ef4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","establishes_status":["historical"]},"eia-state-utility-capacity-b-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b","title":"EIA Electric Power Monthly Table6.2.B Net Summer Capacity Using Primarily Renewable Energy Sources and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:44.899891+00:00","sha256":"20f576441d75cc9a13b4fecd53baea7b9c348ce5a405db26a130ba9d907cd6e5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-b-aug2026.html","tier":"A","scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","establishes_status":["historical"]},"eia-state-utility-capacity-c-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c","title":"EIA Electric Power Monthly Table6.2.C Net Summer Capacity of Utility Scale Units Using Primarily Fossil Fuels and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:45.187621+00:00","sha256":"c02ce3ee446a70f915c4a47e07e680b6b048cf2b1d7e51cb055c1a6beeab78a7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-c-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","establishes_status":["historical"]},"eia-planned-utility-additions-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05","title":"EIA Electric Power Monthly Table6.5 Planned U.S.Electric Generating Unit Additions(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:03:52.284370+00:00","sha256":"769a513425ec30e9bf6983fc4186d2f367e253fb6ed1072537ae44495c762912","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-additions-aug2026.html","tier":"A","scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","establishes_status":["historical"]},"eia-epa2025-ieee-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.2 IEEE distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:04:08.692385+00:00","sha256":"5709d427dc11697b35e5e04aa1a247483fe64906acac03437366504ec591003c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-ieee-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution."},"eia-epa2025-any-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.3 any-method distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:33:56.041642+00:00","sha256":"40cf45b1731954b256ee1d6c79f2e29b126baf8012ba47794d6546dd6f239cb5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-any-method-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins."},"eia-epa2025-saidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.4 annual SAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:04:10.386421+00:00","sha256":"52f619cdbec1026136cd0b2a0414cc6b551066272aebf2de3c6ddee772b1fc3d","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution."},"eia-epa2025-saifi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.5 annual SAIFI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:34:19.009385+00:00","sha256":"6b41da37d3a8d7491eee3d7355e4625b385f362fb6c4796d0335b92f4d0b3ff4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saifi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation."},"eia-epa2025-caidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.6 annual CAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T01:03:57.191681+00:00","sha256":"1b065b30dbde195e80079c282ba99411c62ead9d971e378dd03df0baae861675","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-caidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution."}},"details":[{"id":"price-vt","html":"<article><h3>Vermont</h3><p class=\"layer-scope\">A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table heading.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table heading.</p></dd><dt>Price</dt><dd>23.75 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary residential state average, cents per kWh. Locator: Residential July 2026, Vermont.</p></dd><dt>Prior price</dt><dd>22.14 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential state average for the comparison month. Locator: Residential July 2025, Vermont.</p></dd></dl></article>"},{"id":"price-vt-202608","html":"<article><h3>Vermont</h3><p class=\"layer-scope\">Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Price</dt><dd>23.84 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary August2026 residential state average, cents per kWh. Locator: Table_5_06_A!B11:C11.</p></dd><dt>Prior price</dt><dd>22.10 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final August2025 residential state average, cents per kWh. Locator: Table_5_06_A!B11:C11.</p></dd><dt>Source context</dt><dd>The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture. Locator: HTML table heading and report header; spreadsheet rows1 through4 and67.</p></dd></dl></article>"},{"id":"tariff-bill-vt-h727-veto-20260529","html":"<article><h3>Vermont vetoed data center power framework</h3><p class=\"layer-scope\">Historical vetoed bill with unsuccessful override. Proposed protections did not take effect through H727; this is not a review of current individual utility tariffs.</p><dl class=\"layer-fields\"><dt>Vt h727 veto basis</dt><dd>Vetoed bill with unsuccessful House override<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical legislative outcome, not an enacted requirement or utility tariff approval. Locator: Governor May28 announcement; House journal May29 page2399.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed May28 and veto sustained May29. Proposed terms below did not take effect through H727; not currently pending, enacted or an approved utility tariff. Locator: Official status; veto announcement; House journal2399.</p></dd><dt>Bill version</dt><dd>H727 as passed by House and Senate; readable VT LEG389783v1<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Official.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Legislature hosted Unofficial readable version checked against selected final inserted marked pages. Not a signed act. Locator: Readable cover and footer; marked pages22,24,39.</p></dd><dt>Version boundary</dt><dd>Marked PDF pages1through10 and11through22 contain superseded blocks; final replacement starts on page22 and continues through39.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Official.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Selected marked pages1and22 show visible deletion marks. Never merge earlier standalone tariff or siting language into the final contract provisions. Locator: Marked pages1and22; readable pages1through5.</p></dd><dt>Vetoed on</dt><dd>May 28, 2026<span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Governor returned bill unsigned and without approval. Enacting formula in bill text does not establish enactment. Locator: Governor announcement.</p></dd><dt>Veto sustained on</dt><dd>May 29, 2026<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">House declined to pass the bill notwithstanding the veto. This is a completed historical vote, not a scheduled hearing. Locator: Official status; journal2399.</p></dd><dt>Override vote</dt><dd>Eighty three yes, fifty two no; ninety yes required among135votes. Override failed.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Yes meant pass notwithstanding the veto, not support for sustaining it. Majority support did not meet the stated two thirds threshold. Locator: Journal2399 question and tally.</p></dd><dt>Governor explanation</dt><dd>Governor cited existing regulatory authority and concern about broader economic effects; suggested a substantially revised approach closer to the House version.<span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Attributed executive explanation, not independently established economic harm, quantified savings or a utility commission finding. Locator: Governor veto letter.</p></dd><dt>Threshold</dt><dd>Facility uses or is able to use20MWor more AND provides the specified data processing, hosting and related NAICS518210services.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Inclusive20MWcapability and activity definition, not only measured draw, a threshold above20MWor every industrial electricity customer. Vetoed proposal only. Locator: Readable page1 proposed283.</p></dd><dt>Facility aggregation</dt><dd>Common ownership or control with a single, contiguous or adjacent site, OR nonadjacent sites functioning as one integrated operation through shared infrastructure or unified protocols under central management.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Nonadjacent aggregation is conditional; not automatic combination of every unrelated site or corporate portfolio. Vetoed proposal only. Locator: Readable page2 proposed283.</p></dd><dt>Proposed contract review</dt><dd>Data center electric service would require a PUC approved large load service equity contract.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Final vetoed proposal uses contract review. Not an actual approved contract or the earlier deleted standalone tariff schedule framework. Locator: Readable page2 proposed284a.</p></dd><dt>Proposed cost allocation</dt><dd>Equal or proportional service cost allocation, equitable embedded network contributions and insulation of other customer classes from data center deployment costs including generation, transmission, distribution, energy capacity and resource adequacy.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Proposed protection, not observed customer savings or proof a particular cost allocation was approved. Locator: Readable pages2and3 proposed284b1and2.</p></dd><dt>Proposed contract length</dt><dd>Minimum ten years, with service start date or estimated date stated in the contract.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Minimum duration, not exactly ten years, an executed agreement, actual start date or separately specified ramp period. Vetoed proposal only. Locator: Readable page3 proposed284b3.</p></dd><dt>Proposed minimum payment</dt><dd>Contract would specify a minimum amount OR percentage based on projected electricity usage for its duration.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No numerical floor or universal demand versus energy formula supplied here; not a sixty percent minimum electric bill. Vetoed proposal only. Locator: Readable page3 proposed284b4.</p></dd><dt>Proposed excess demand</dt><dd>Reasonable charge for demand beyond the electricity demand projected when the contract is entered.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No numerical price or executed charge established. Vetoed proposal only. Locator: Readable page3 proposed284b5.</p></dd><dt>Proposed collateral</dt><dd>Collateral sufficient to prevent stranded cost risk.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No fixed dollars, letter of credit term or credit grade established. Vetoed proposal only. Locator: Readable page3 proposed284b6.</p></dd><dt>Proposed curtailment</dt><dd>Contract would address load curtailment procedures and priorities during grid emergencies.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not proof of an actual curtailment, unconditional interruptible service or a universal compensation rate. Vetoed proposal only. Locator: Readable page4 proposed284b8.</p></dd><dt>Proposed findings</dt><dd>Written reasoned PUC findings on general good, grid effects, economic benefit, resource plans, transmission and environmental justice.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Required findings in a vetoed proposal, not actual agency findings or demonstrated economic benefits. Locator: Readable pages4and5 proposed284c.</p></dd><dt>Proposed periodic review</dt><dd>Contract compliance reviews at intervals not exceeding two years, with earlier review allowed for good cause or public interest.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Review interval differs from minimum ten year contract; not automatic two year termination or an observed compliance review. Vetoed proposal only. Locator: Readable page5 proposed284d.</p></dd><dt>Proposed program exclusions</dt><dd>Specified energy savings accounts, customer credit and self managed energy efficiency programs would be unavailable to defined data centers.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Only listed programs, not every renewable incentive or a determination of present eligibility. Vetoed proposal only. Locator: Readable page5 proposed284e.</p></dd><dt>Proposed site analysis</dt><dd>Before a permit application, site suitability analysis in consultation with electric and efficiency utilities would assess building standards, renewable generation, storage, demand response and waste heat recovery capacity.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Preliminary capacity assessment, not mandatory installed heat recovery at every site or an actual permit application. Vetoed proposal only. Locator: Readable page6 proposed285b.</p></dd><dt>Proposed backup generation</dt><dd>Combustion backup limited to emergencies involving power failures or interruptions; otherwise prioritize storage and onsite renewables to the greatest extent practicable.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Covers combustion, not only natural gas. No explicit testing exception or fixed hours cap in reviewed subsection, installed generator count or actual emissions established. Vetoed proposal only. Locator: Readable page7 proposed285c.</p></dd><dt>Proposed renewables</dt><dd>Maximize onsite renewable generation to the greatest extent technically feasible; directly polluting fuel combustion generation does not qualify unless it is a thermal energy plant.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Technical feasibility and thermal exception retained. Not an absolute100percent onsite generation obligation or built capacity. Vetoed proposal only. Locator: Readable page7 proposed285d.</p></dd><dt>Proposed environmental attributes</dt><dd>Renewable certificates or environmental attributes from plants constructed under the subsection would transfer to the electric company.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Proposed transfer, not evidence a developer retained or actually transferred credits. Vetoed proposal only. Locator: Readable page7 proposed285d.</p></dd><dt>Proposed transformation payment</dt><dd>Annual energy transformation fund payment equals60percent of prior calendar year electricity usage multiplied by the specified alternative compliance payment rate. Advance payment uses projected usage, reconciled in the next year.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">This separate proposed payment is not a60percent electric bill floor,60percent of dollar revenue or an actual payment. No total computed without usage and applicable rate. Vetoed proposal only. Locator: Readable pages7and8 proposed285e.</p></dd><dt>Proposed payment location</dt><dd>Fund would support energy transformation projects in host and surrounding communities to the extent practicable, with prorated credit for projects also supported by regulated entities.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional location and credit allocation, not guaranteed local benefits or measured emissions reductions. Vetoed proposal only. Locator: Readable page8 proposed285e.</p></dd><dt>Proposed virtual power plant</dt><dd>Participate in utility managed virtual power plant if available AND technically feasible; otherwise design and implement a coordinated self managed plant. Funding would be additional to the listed support programs.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Both conditions and fallback retained. Not an existing virtual plant, a physical central power station or an automatic exemption. Vetoed proposal only. Locator: Readable pages8and9 proposed285f.</p></dd><dt>Proposed quarterly reports</dt><dd>Reports begin within three months after operation, covering water and energy usage, daily peak usage and shared infrastructure payments, subject to public records inspection.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Proposed reporting clock, not observed usage or a report actually filed. Vetoed proposal only. Locator: Readable page9 proposed286a.</p></dd><dt>Proposed annual report</dt><dd>Department annual report beginning on or before January15,2028, provided at least one data center has entered the specified contract.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional proposal, not unconditional January1deadline, a present calendar obligation or actual completed report. Vetoed proposal only. Locator: Readable pages9and10 proposed286b.</p></dd><dt>Proposed application</dt><dd>Would cover data centers not operational at effect, and operational centers below20MWto the extent an expansion meets the statutory definition.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Official.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional expansion scope, not blanket exemption for every existing facility. The proposed effective date never became an effective date through H727. Locator: Readable page18; marked page39 proposed section6.</p></dd><dt>Review boundary</dt><dd>Whole readable18page text read; power pages1through10and18 viewed, marked1/22/24/39 viewed, journalPDF17 printed2399 viewed, official history and veto announcement read.<span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Unofficial.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0727/H-0727%20As%20Passed%20by%20Both%20House%20and%20Senate%20Official.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Sixteen selected PDF frames, not whole marked39page or whole223page journal visual review. No later PUC tariff inventory, individual contract, actual load, current statute inventory or operational compliance reviewed. Locator: Retained originals and frame manifest.</p></dd><dt>Law approved on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Law effective on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Approved on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Effective on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Current governing tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual contract length</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Minimum bill</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Collateral</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Exit fees</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Approved project mw</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual service on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual security payment</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual ratepayer savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Individual project approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual virtual power plant</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual renewable generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual transformation payment</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Actual water withdrawal</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/bill/status/2026/H.727\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://governor.vermont.gov/press-release/action-taken-governor-phil-scott-legislation-may-28-2026\">Office of Governor Phil Scott</a>. Source: May 28, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://legislature.vermont.gov/Documents/2026/Docs/JOURNAL/hj260529.pdf\">Vermont General Assembly</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Vetoed proposal and historical vote do not establish an enacted requirement, approved tariff, contract or actual project outcome. Locator: Legislative review boundary.</p></dd></dl></article>"},{"id":"tariff-vt-gmp-6365-oct2026","html":"<article><h3>Green Mountain Power general industrial time of use tariff</h3><p class=\"layer-scope\">General utility context with conditional demand and voltage provisions. No project outcomes established.</p><dl class=\"layer-fields\"><dt>Vt gmp 6365 basis</dt><dd>Posted general commercial and industrial time of use tariff.<span class=\"layer-source\"><a href=\"https://greenmountainpower.com/rates/\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">GMP service territory only, not dedicated data center protections. Locator: Heading.</p></dd><dt>Status</dt><dd>program<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Posted utility context, not independent approval or complete current legal version. Locator: Heading.</p></dd><dt>Utility</dt><dd>Green Mountain Power<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific utility, not all Vermont utilities. Locator: Heading.</p></dd><dt>Schedule</dt><dd>Commercial and Industrial63/65, VPUC10<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Distinct from primary12 or transmission70. Locator: Heading.</p></dd><dt>Threshold</dt><dd>Required when average consumption during any four consecutive months is strictly greater than7600 kWh per month OR average actual demand during any four consecutive months is strictly greater than200 kW.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Four month averages and strict thresholds, not one peak, billing demand floor or200 MW. Locator: Page1.</p></dd><dt>Source difference</dt><dd>Index says7600 kWh or more per month; tariff specifies four month average strictly greater than7600 kWh per month.<span class=\"layer-source\"><a href=\"https://greenmountainpower.com/rates/\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Different issuer wording preserved without converting strict tariff threshold to inclusive. Locator: Index63/65 and tariff page1.</p></dd><dt>Transfer conditions</dt><dd>Remain at least twelve monthly billing periods, then unless consumption is less than6600 kWh AND billing demand less than150 kW during each of twelve consecutive months.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Both exit gates apply each month; entry actual demand differs from exit billing demand. Locator: Page1.</p></dd><dt>Special contract</dt><dd>Special rates may be required for unique requirements imposing significant costs unrecovered by standard tariffs; subject to Vermont Public Utility Commission approval.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional process, not an already approved customer contract or universal data center provision. Locator: Page1.</p></dd><dt>Station service</dt><dd>Only primary use serving an offline generation facility qualifies: no peak Investment Charge, all periods offpeak for Investment Charge purposes; other charges and credits remain.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not all backup generation, free energy or all charges waived. Locator: Page1.</p></dd><dt>Customer charge</dt><dd>5.347 dollars per day.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Daily customer component only, not actual total bill. Locator: Page2.</p></dd><dt>Demand prices</dt><dd>Peak21.038 dollars per kW; offpeak6.057 dollars per kW.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Separate demand components, schedule subject to adjustment. Locator: Page2.</p></dd><dt>Energy prices</dt><dd>Peak0.14844 dollars per kWh; offpeak0.11281 dollars per kWh.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Energy components only, not complete bill. Locator: Page2.</p></dd><dt>Peak hours</dt><dd>Utility selects sixteen consecutive hours between06:00 and23:00 on weekdays; all other times offpeak.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not entire seventeen hour window or a known selected start time. Locator: Page2.</p></dd><dt>Billing demand</dt><dd>Peak greatest current peak hours fifteen minute kW, not less than50 percent of highest fifteen minute peak in preceding eleven months peak periods.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Peak historical floor, not minimum energy or offpeak historical ratchet. Locator: Page2.</p></dd><dt>Offpeak demand</dt><dd>Greatest fifteen minute kW during current month offpeak hours.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Current month measure distinct from peak history. Locator: Page3.</p></dd><dt>Coincident demand</dt><dd>Utility may make same service location meters coincident and impose minimum demand for coincidentalized accounts; different business or service locations not coincident.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Discretionary treatment, not automatic portfolio aggregation. Locator: Page3.</p></dd><dt>Power factor</dt><dd>Average power factor at least95 percent; below95 peak Investment Charge increases by ratio95 percent to actual power factor.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Peak Investment Charge only, not entire bill or fixed percent per point. Locator: Page3.</p></dd><dt>Power factor waivers</dt><dd>Utility may waive determination and billing for three phase demands less than100 kW; may assume95 percent for single phase and waive measurement.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Discretionary, not guaranteed or inclusive100 kW. Locator: Page3.</p></dd><dt>Primary discount</dt><dd>4.00 percent on sum Investment and Energy charges with required customer owned and maintained equipment and delivery2.4 to34.5 kV.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not full bill rebate; equipment obligations required. Locator: Pages2 and3.</p></dd><dt>Secondary meter losses</dt><dd>Secondary metering includes transformer losses; one transformer or bank not exceeding500 kVA may use factor1.03 on recorded kW and kWh.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional upward adjustment, not discount or universal factor. Locator: Page4.</p></dd><dt>Subtransmission discount</dt><dd>21.65 percent on sum Investment and Energy charges with required customer owned and maintained equipment and delivery33 to69 kV; secondary metering includes losses.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional service and equipment requirements, not full bill discount. Locator: Pages2 and4.</p></dd><dt>Large subtransmission discount</dt><dd>Separate23.04 percent discount when monthly demand strictly greater than20 MW; subtransmission discount excludes primary metering discount.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Exactly20 MW does not qualify; discounts do not stack. Locator: Pages2 and4.</p></dd><dt>Transformer credit</dt><dd>1.1302 dollars per greater peak or offpeak billing kW after all discounts when customer supplies all transformers OR uses delivery at least2300 V so utility provides none.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional demand based credit, not fixed monthly amount or actual savings. Locator: Pages2 and4.</p></dd><dt>Equipment boundary</dt><dd>Meter normally divides ownership unless utility opts otherwise; primary customer owns downstream primary equipment and transformation and maintains utility standards.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Obligation context, not installed equipment or paid construction. Locator: Page5.</p></dd><dt>Meter aggregation</dt><dd>Total service normally one meter; combining multiple meters requires physically interconnected dependent simultaneous service or integral single operation; common ownership alone insufficient.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not automatic aggregation of separate business units. Locator: Page5.</p></dd><dt>Suspension reconnection</dt><dd>Reconnection less than twelve months after suspension retroactively bills minimum demand as if active each month back to suspension.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Strict less than twelve month condition; suspension does not erase obligation. Locator: Page6.</p></dd><dt>Contract length</dt><dd>Initial term not less than one year, in writing if utility requires.<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Distinct from twelve monthly billing periods placement, not penalty free exit. Locator: Page6.</p></dd><dt>Effective on</dt><dd>October 1, 2026<span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Effective bills rendered on or after date; not reviewed approval day. Locator: All page footers.</p></dd><dt>Approved on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Issued on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Current governing tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Minimum bill</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Collateral</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Exit fees</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Individual project approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Individual contract</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Actual energy</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Actual bill</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Actual ratepayer savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://static.greenmountainpower.com/tariffs/rates/Rate-63-65-Commercial-Industrial.pdf\">Green Mountain Power</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific project actual or complete current governing obligation not established; peak demand floor separately retained. Locator: Scope boundary and unreviewed complete service terms.</p></dd></dl></article>"},{"id":"grid-isone-forecast-screening-20260518","html":"<article><h3>New England dated large load forecast screening</h3><p class=\"layer-scope\">Regional formal study and planning context, not current queue totals or operating data centers.</p><dl class=\"layer-fields\"><dt>Isone forecast screen basis</dt><dd>Dated New England formal study proposals and screened planning forecast.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Regional mixed large loads, not data center only requests or current interconnection queue. Locator: May18article; June2slides4and5.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Dated forecast and proposal context, not project approval or operating status. Locator: May18article and June2deck.</p></dd><dt>Snapshot period</dt><dd>May2026<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Month of published report; no exact date of underlying transmission owner survey inferred. Locator: Article dated May18.</p></dd><dt>Proposal context</dt><dd>May18article reports two proposed large load projects in formal study, together at most285 MW.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Potential demand upper bound, not approved connections, data center only capacity or current raw request inventory. Locator: Article survey paragraph.</p></dd><dt>Later rounded context</dt><dd>June2deck describes a few formal study projects below300 MW.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Different dated rounded wording retained, not an increase, a new count or a replacement of earlier at most285 MW. Locator: Slide5.</p></dd><dt>Forecast entry</dt><dd>Forecast includes projects at least20 MW with formal transmission study agreements.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Both gates required. Not every early inquiry, all projects above20 MW or a new approved retail tariff threshold. Locator: Slide4.</p></dd><dt>Forecast adjustments</dt><dd>Gather prospective load information with transmission owners, determine derate factors and effective nameplate, develop nameplate forecast and hourly usage profiles reflecting daily and calendar effects.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Forecast method differs from raw nameplate or actual metered use. Locator: Slide4.</p></dd><dt>Peak forecast</dt><dd>Article forecasts around110 MW contribution to summer and winter peaks in2030s, about130 MW in2040s.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Approximate forecast contributions, not285 MW raw proposals, current actual load or each state amount. Locator: Article peak forecast paragraph.</p></dd><dt>Near term wording</dt><dd>May18article expects no overall demand effect before winter2027/2028; June2deck says minimal impact before2027/2028.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Dated expectations with different wording, not measured zero operating load or guaranteed start dates. Locator: Article; slide5.</p></dd><dt>Energy forecast</dt><dd>Article describes annual energy around800 GWh from2030 to2035, around1000 GWh in2040s.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Annual forecast wording, not cumulative six year energy or actual consumption. June2slide5 omits explicit annual label; no arithmetic sum. Locator: Article annual energy paragraph.</p></dd><dt>Regional scope</dt><dd>New England regional context across Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">One shared regional amount, not six separate state totals, facility identities or statewide utility tariff reviews. Locator: Regional scope.</p></dd><dt>Source review boundary</dt><dd>Whole May18article main text and seven page June2deck text read; only deck4and5frames inspected.<span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100035/clg_meeting_rojo_iso_large_loads_06_02_2026.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No individual project table in this deck, current CELT workbook, later tariff docket or underlying project agreement review. Locator: Review scope.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Current requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Actual energy</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Data center only capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/\">ISO New England</a>. Source: May 18, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical formal study and forecasts do not establish current queue, actual consumption, approved capacity or identity join. Locator: Scope boundary.</p></dd><dt>Isone celt draft scope</dt><dd>March27,2026 deck is explicitly Final Draft. Physical slide14 lists NEMA data center200MW through2027 and Connecticut general electrification85MW through2040. Nameplate is before derating, mixed project types and regional zones, not285MW of operating data centers or a current request queue.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated final draft context, no individual site identity or current operating claim. Locator: Physical slides1,6,14; slide14 visually reviewed.</p></dd><dt>Isone celt construction boundary</dt><dd>Slide14 says neither listed project was under construction in this dated snapshot and excludes them from winter2026/2027 and summer2026and2027 forecast periods. This historical screening assumption does not establish current construction status, a guaranteed completion date or measured zero load.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated final draft context, no individual site identity or current operating claim. Locator: Physical slides1,6,14; slide14 visually reviewed.</p></dd><dt>Isone celt threshold wording</dt><dd>Slide6 says20MW or greater and a formal study agreement; slide14 says larger than20MW and a formal study agreement. Both original phrasings are retained without resolving exact20MW boundary eligibility or treating forecast screening as project approval.<span class=\"layer-source\"><a href=\"https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf\">ISO New England</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated final draft context, no individual site identity or current operating claim. Locator: Physical slides1,6,14; slide14 visually reviewed.</p></dd></dl></article>"},{"id":"sector-price-vt-202608","html":"<article><h3>Vermont commercial and industrial electricity prices</h3><p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Current preliminary comparison month. Locator: Table5.6.A header.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Final same month previous year. Locator: Table5.6.A header.</p></dd><dt>Sector price boundary</dt><dd>State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table5.6.A notes, including row67.</p></dd><dt>Commercial price</dt><dd>20.47 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!D11; matching HTML state row.</p></dd><dt>Prior commercial price</dt><dd>19.05 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!E11; matching HTML state row.</p></dd><dt>Industrial price</dt><dd>12.72 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!F11; matching HTML state row.</p></dd><dt>Prior industrial price</dt><dd>12.05 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!G11; matching HTML state row.</p></dd><dt>All sector price</dt><dd>20.01 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Vermont All Sectors August comparison.</p></dd><dt>Prior all sector price</dt><dd>18.64 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Vermont All Sectors August comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd><dt>Ytd commercial price</dt><dd>20.87 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!D11; matching HTML state row.</p></dd><dt>Prior ytd commercial price</dt><dd>19.40 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!E11; matching HTML state row.</p></dd><dt>Ytd industrial price</dt><dd>12.90 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!F11; matching HTML state row.</p></dd><dt>Prior ytd industrial price</dt><dd>12.09 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!G11; matching HTML state row.</p></dd><dt>Ytd all sector price</dt><dd>20.28 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!J11; matching HTML state row.</p></dd><dt>Prior ytd all sector price</dt><dd>18.92 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!K11; matching HTML state row.</p></dd><dt>Ytd period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Prior ytd period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Ytd price boundary</dt><dd>January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail sales period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales residential</dt><dd>187.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column1.</p></dd><dt>Retail sales residential prior</dt><dd>186.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column2.</p></dd><dt>Retail sales commercial</dt><dd>183.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column3.</p></dd><dt>Retail sales commercial prior</dt><dd>181.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column4.</p></dd><dt>Retail sales industrial</dt><dd>110.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column5.</p></dd><dt>Retail sales industrial prior</dt><dd>109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column6.</p></dd><dt>Retail sales transportation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column7.</p></dd><dt>Retail sales transportation prior</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column8.</p></dd><dt>Retail sales all</dt><dd>481.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column9.</p></dd><dt>Retail sales all prior</dt><dd>475.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Vermont row,column10.</p></dd><dt>Ytd retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail sales period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales residential</dt><dd>1506.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column1.</p></dd><dt>Ytd retail sales residential prior</dt><dd>1512.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column2.</p></dd><dt>Ytd retail sales commercial</dt><dd>1345.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column3.</p></dd><dt>Ytd retail sales commercial prior</dt><dd>1347.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column4.</p></dd><dt>Ytd retail sales industrial</dt><dd>851.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column5.</p></dd><dt>Ytd retail sales industrial prior</dt><dd>844.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column6.</p></dd><dt>Ytd retail sales transportation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column7.</p></dd><dt>Ytd retail sales transportation prior</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column8.</p></dd><dt>Ytd retail sales all</dt><dd>3702.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column9.</p></dd><dt>Ytd retail sales all prior</dt><dd>3703.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Vermont row,column10.</p></dd><dt>Retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail revenue period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue residential</dt><dd>45.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column1.</p></dd><dt>Retail revenue residential prior</dt><dd>41.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column2.</p></dd><dt>Retail revenue commercial</dt><dd>37.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column3.</p></dd><dt>Retail revenue commercial prior</dt><dd>34.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column4.</p></dd><dt>Retail revenue industrial</dt><dd>14.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column5.</p></dd><dt>Retail revenue industrial prior</dt><dd>13.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column6.</p></dd><dt>Retail revenue transportation</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column7.</p></dd><dt>Retail revenue transportation prior</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column8.</p></dd><dt>Retail revenue all</dt><dd>96.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column9.</p></dd><dt>Retail revenue all prior</dt><dd>89.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Vermont row,column10.</p></dd><dt>Ytd retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail revenue period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue residential</dt><dd>361.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column1.</p></dd><dt>Ytd retail revenue residential prior</dt><dd>337.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column2.</p></dd><dt>Ytd retail revenue commercial</dt><dd>281.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column3.</p></dd><dt>Ytd retail revenue commercial prior</dt><dd>261.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column4.</p></dd><dt>Ytd retail revenue industrial</dt><dd>110.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column5.</p></dd><dt>Ytd retail revenue industrial prior</dt><dd>102.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column6.</p></dd><dt>Ytd retail revenue transportation</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column7.</p></dd><dt>Ytd retail revenue transportation prior</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column8.</p></dd><dt>Ytd retail revenue all</dt><dd>751.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column9.</p></dd><dt>Ytd retail revenue all prior</dt><dd>700.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Vermont row,column10.</p></dd><dt>Retail customers basis</dt><dd>Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail customers period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers residential</dt><dd>314,483 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column1.</p></dd><dt>Retail customers residential prior</dt><dd>314,906 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column2.</p></dd><dt>Retail customers commercial</dt><dd>65,958 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column3.</p></dd><dt>Retail customers commercial prior</dt><dd>64,453 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column4.</p></dd><dt>Retail customers industrial</dt><dd>222 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column5.</p></dd><dt>Retail customers industrial prior</dt><dd>228 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column6.</p></dd><dt>Retail customers transportation</dt><dd>0 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column7.</p></dd><dt>Retail customers transportation prior</dt><dd>0 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column8.</p></dd><dt>Retail customers all</dt><dd>380,663 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column9.</p></dd><dt>Retail customers all prior</dt><dd>379,587 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Vermont row,column10.</p></dd></dl></article>"},{"id":"sector-price-vt-202607","html":"<article><h3>Vermont historical commercial and industrial electricity prices</h3><p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Sector price boundary</dt><dd>Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Commercial price</dt><dd>20.71 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Vermont commercial_price.</p></dd><dt>Prior commercial price</dt><dd>19.39 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Vermont prior_commercial_price.</p></dd><dt>Industrial price</dt><dd>13.07 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Vermont industrial_price.</p></dd><dt>Prior industrial price</dt><dd>12.23 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Vermont prior_industrial_price.</p></dd><dt>All sector price</dt><dd>20.17 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Vermont All Sectors July comparison.</p></dd><dt>Prior all sector price</dt><dd>18.95 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Vermont All Sectors July comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd></dl></article>"},{"id":"generation-vt-202608","html":"<article><h3>Vermont utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A period and source notes.</p></dd><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>176.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column1.</p></dd><dt>Prior all generation</dt><dd>110.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column2.</p></dd><dt>Published generation change</dt><dd>59.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column3.</p></dd><dt>Utility generation</dt><dd>76.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column4.</p></dd><dt>Prior utility generation</dt><dd>50.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column5.</p></dd><dt>Ipp generation</dt><dd>100.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column6.</p></dd><dt>Prior ipp generation</dt><dd>60.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column7.</p></dd><dt>Commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column8.</p></dd><dt>Prior commercial generation</dt><dd>0.05 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column9.</p></dd><dt>Industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column10.</p></dd><dt>Prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Vermont row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column1.</p></dd><dt>Gas prior all generation</dt><dd>0.07 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column2.</p></dd><dt>Gas published generation change</dt><dd>-100.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column3.</p></dd><dt>Gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>0.05 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column5.</p></dd><dt>Gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column7.</p></dd><dt>Gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>0.02 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column9.</p></dd><dt>Gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Vermont row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column2.</p></dd><dt>Nuclear published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Vermont row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column1.</p></dd><dt>Coal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column2.</p></dd><dt>Coal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column3.</p></dd><dt>Coal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column5.</p></dd><dt>Coal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column9.</p></dd><dt>Coal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Vermont row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column1.</p></dd><dt>Wind prior all generation</dt><dd>16.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column2.</p></dd><dt>Wind published generation change</dt><dd>26.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column3.</p></dd><dt>Wind utility generation</dt><dd>10.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column5.</p></dd><dt>Wind ipp generation</dt><dd>10.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Vermont row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>80.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>17.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column2.</p></dd><dt>Hydro published generation change</dt><dd>363.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column3.</p></dd><dt>Hydro utility generation</dt><dd>24.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>56.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>17.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Vermont row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Vermont row; column11.</p></dd><dt>Solar pv period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>82.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>56.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>46.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>26.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>28.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>56.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>28.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>21.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>11.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>11.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>0.37 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>0.21 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>0.37 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>0.21 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>23.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>17.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Vermont row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Vermont row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>-0.11 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column2.</p></dd><dt>Other energy published generation change</dt><dd>-100.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>-0.11 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Vermont row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Vermont row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column2.</p></dd><dt>Biomass published generation change</dt><dd>0.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column3.</p></dd><dt>Biomass utility generation</dt><dd>34.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>34.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Vermont row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>0.17 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>0.17 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Vermont row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Vermont row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Vermont row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>95.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>93.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>2.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>51.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>44.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>44.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Vermont row; column11.</p></dd></dl></article>"},{"id":"generation-vt-202608-ytd","html":"<article><h3>Vermont utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B period and source notes.</p></dd><dt>Period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>1347.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column1.</p></dd><dt>Prior all generation</dt><dd>1522.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column2.</p></dd><dt>Published generation change</dt><dd>-11.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column3.</p></dd><dt>Utility generation</dt><dd>560.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column4.</p></dd><dt>Prior utility generation</dt><dd>623.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column5.</p></dd><dt>Ipp generation</dt><dd>786.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column6.</p></dd><dt>Prior ipp generation</dt><dd>897.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column7.</p></dd><dt>Commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column8.</p></dd><dt>Prior commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column9.</p></dd><dt>Industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column10.</p></dd><dt>Prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Vermont row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column1.</p></dd><dt>Gas prior all generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column2.</p></dd><dt>Gas published generation change</dt><dd>34.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column3.</p></dd><dt>Gas utility generation</dt><dd>0.49 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>0.19 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column5.</p></dd><dt>Gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column7.</p></dd><dt>Gas commercial generation</dt><dd>0.44 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column9.</p></dd><dt>Gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Vermont row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column2.</p></dd><dt>Nuclear published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Vermont row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column1.</p></dd><dt>Coal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column2.</p></dd><dt>Coal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column3.</p></dd><dt>Coal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column5.</p></dd><dt>Coal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column9.</p></dd><dt>Coal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Vermont row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>232.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column1.</p></dd><dt>Wind prior all generation</dt><dd>259.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column2.</p></dd><dt>Wind published generation change</dt><dd>-10.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column3.</p></dd><dt>Wind utility generation</dt><dd>120.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>131.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column5.</p></dd><dt>Wind ipp generation</dt><dd>113.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Vermont row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>655.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>802.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column2.</p></dd><dt>Hydro published generation change</dt><dd>-18.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column3.</p></dd><dt>Hydro utility generation</dt><dd>218.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>254.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>438.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>548.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Vermont row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Vermont row; column11.</p></dd><dt>Solar pv period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>519.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>341.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>52.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>162.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>155.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>357.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>186.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>41.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>41.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>121.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>113.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>206.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>76.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>206.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>76.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Vermont row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Vermont row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>-1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column2.</p></dd><dt>Other energy published generation change</dt><dd>-100.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>-1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Vermont row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Vermont row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>290.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>304.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column2.</p></dd><dt>Biomass published generation change</dt><dd>-4.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column3.</p></dd><dt>Biomass utility generation</dt><dd>174.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>195.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>115.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Vermont row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Vermont row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Vermont row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Vermont row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>684.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>718.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>-4.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>335.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>367.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>348.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>350.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Vermont row; column11.</p></dd></dl></article>"},{"id":"capacity-state-utility-vt-202608","html":"<article><h3>Vermont utility scale net summer capacity</h3><p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.</p><dl class=\"layer-fields\"><dt>Utility capacity basis</dt><dd>Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Title,technology headers and exclusions.</p></dd><dt>Utility capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Utility capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Dated source period.</p></dd><dt>Utility capacity renewables</dt><dd>717.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column1.</p></dd><dt>Utility capacity renewables prior</dt><dd>715.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column2.</p></dd><dt>Utility capacity fossil</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column3.</p></dd><dt>Utility capacity fossil prior</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column4.</p></dd><dt>Utility capacity pumped storage</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column5.</p></dd><dt>Utility capacity pumped storage prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column6.</p></dd><dt>Utility capacity other storage</dt><dd>20.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column7.</p></dd><dt>Utility capacity other storage prior</dt><dd>20.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column8.</p></dd><dt>Utility capacity nuclear</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column9.</p></dd><dt>Utility capacity nuclear prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column10.</p></dd><dt>Utility capacity other sources</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column11.</p></dd><dt>Utility capacity other sources prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column12.</p></dd><dt>Utility capacity all</dt><dd>855.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column13.</p></dd><dt>Utility capacity all prior</dt><dd>854.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Vermont row,column14.</p></dd><dt>Renew capacity basis</dt><dd>Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Title,technology headers and exclusions.</p></dd><dt>Renew capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Dated source period.</p></dd><dt>Renew capacity wind</dt><dd>150.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column1.</p></dd><dt>Renew capacity wind prior</dt><dd>150.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column2.</p></dd><dt>Renew capacity solar pv</dt><dd>156.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column3.</p></dd><dt>Renew capacity solar pv prior</dt><dd>154.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column4.</p></dd><dt>Renew capacity solar thermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column5.</p></dd><dt>Renew capacity solar thermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column6.</p></dd><dt>Renew capacity conventional hydro</dt><dd>331.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column7.</p></dd><dt>Renew capacity conventional hydro prior</dt><dd>331.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column8.</p></dd><dt>Renew capacity biomass</dt><dd>79.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column9.</p></dd><dt>Renew capacity biomass prior</dt><dd>79.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column10.</p></dd><dt>Renew capacity geothermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column11.</p></dd><dt>Renew capacity geothermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column12.</p></dd><dt>Renew capacity total utility</dt><dd>717.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column13.</p></dd><dt>Renew capacity total utility prior</dt><dd>715.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column14.</p></dd><dt>Renew capacity small pv estimated</dt><dd>376.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column15.</p></dd><dt>Renew capacity small pv estimated prior</dt><dd>184.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column16.</p></dd><dt>Renew capacity combined pv estimated</dt><dd>532.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column17.</p></dd><dt>Renew capacity combined pv estimated prior</dt><dd>339.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column18.</p></dd><dt>Renew capacity combined solar estimated</dt><dd>532.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column19.</p></dd><dt>Renew capacity combined solar estimated prior</dt><dd>339.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Vermont row,column20.</p></dd><dt>Fossil capacity basis</dt><dd>Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Title,technology headers and exclusions.</p></dd><dt>Fossil capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Dated source period.</p></dd><dt>Fossil capacity gas combined cycle</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column1.</p></dd><dt>Fossil capacity gas combined cycle prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column2.</p></dd><dt>Fossil capacity gas combustion turbine</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column3.</p></dd><dt>Fossil capacity gas combustion turbine prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column4.</p></dd><dt>Fossil capacity gas other</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column5.</p></dd><dt>Fossil capacity gas other prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column6.</p></dd><dt>Fossil capacity coal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column7.</p></dd><dt>Fossil capacity coal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column8.</p></dd><dt>Fossil capacity petroleum coke</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column9.</p></dd><dt>Fossil capacity petroleum coke prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column10.</p></dd><dt>Fossil capacity petroleum liquids</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column11.</p></dd><dt>Fossil capacity petroleum liquids prior</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column12.</p></dd><dt>Fossil capacity other fossil gas</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column13.</p></dd><dt>Fossil capacity other fossil gas prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column14.</p></dd><dt>Fossil capacity total</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column15.</p></dd><dt>Fossil capacity total prior</dt><dd>117.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Vermont row,column16.</p></dd><dt>Reported planned unit rows</dt><dd>5 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit capacity sum</dt><dd>108.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit nameplate sum</dt><dd>108.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit complete nonoperating rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for VT across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit basis</dt><dd>EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary.</p></dd></dl></article>"},{"id":"power-ieee-reliability-2025-vt","html":"<article><h3>Vermont historical IEEE distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 years2025 and2024.</p></dd><dt>Ieee reliability basis</dt><dd>EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 header and definitions.</p></dd><dt>Ieee coverage 2025</dt><dd>10.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;coverage;Year 2025.</p></dd><dt>Ieee coverage 2024</dt><dd>10.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;coverage;Year 2024.</p></dd><dt>Ieee all events saidi 2025</dt><dd>251.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_saidi;Year 2025.</p></dd><dt>Ieee all events saidi 2024</dt><dd>895.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_saidi;Year 2024.</p></dd><dt>Ieee all events saifi 2025</dt><dd>2.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_saifi;Year 2025.</p></dd><dt>Ieee all events saifi 2024</dt><dd>3.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_saifi;Year 2024.</p></dd><dt>Ieee all events caidi 2025</dt><dd>122.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_caidi;Year 2025.</p></dd><dt>Ieee all events caidi 2024</dt><dd>268.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;all_events_caidi;Year 2024.</p></dd><dt>Ieee without major days saidi 2025</dt><dd>150.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_saidi;Year 2025.</p></dd><dt>Ieee without major days saidi 2024</dt><dd>231.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_saidi;Year 2024.</p></dd><dt>Ieee without major days saifi 2025</dt><dd>1.45 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_saifi;Year 2025.</p></dd><dt>Ieee without major days saifi 2024</dt><dd>1.40 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_saifi;Year 2024.</p></dd><dt>Ieee without major days caidi 2025</dt><dd>103.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_caidi;Year 2025.</p></dd><dt>Ieee without major days caidi 2024</dt><dd>165.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;without_major_days_caidi;Year 2024.</p></dd><dt>Ieee loss supply removed saidi 2025</dt><dd>242.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_saidi;Year 2025.</p></dd><dt>Ieee loss supply removed saidi 2024</dt><dd>884.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_saidi;Year 2024.</p></dd><dt>Ieee loss supply removed saifi 2025</dt><dd>1.42 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_saifi;Year 2025.</p></dd><dt>Ieee loss supply removed saifi 2024</dt><dd>2.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_saifi;Year 2024.</p></dd><dt>Ieee loss supply removed caidi 2025</dt><dd>171.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_caidi;Year 2025.</p></dd><dt>Ieee loss supply removed caidi 2024</dt><dd>429.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Vermont row;loss_supply_removed_caidi;Year 2024.</p></dd><dt>Saidi history ieee all events 2023</dt><dd>486.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2023.</p></dd><dt>Saidi history ieee all events 2022</dt><dd>914.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2022.</p></dd><dt>Saidi history ieee all events 2021</dt><dd>215.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2021.</p></dd><dt>Saidi history ieee all events 2020</dt><dd>158.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2020.</p></dd><dt>Saidi history ieee all events 2019</dt><dd>334.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2019.</p></dd><dt>Saidi history ieee all events 2018</dt><dd>929.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2018.</p></dd><dt>Saidi history ieee all events 2017</dt><dd>1792.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2017.</p></dd><dt>Saidi history ieee all events 2016</dt><dd>198.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2016.</p></dd><dt>Saidi history ieee all events 2015</dt><dd>193.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_all_events;Year 2015.</p></dd><dt>Saidi history ieee without major days 2023</dt><dd>204.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2023.</p></dd><dt>Saidi history ieee without major days 2022</dt><dd>178.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2022.</p></dd><dt>Saidi history ieee without major days 2021</dt><dd>215.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2021.</p></dd><dt>Saidi history ieee without major days 2020</dt><dd>158.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2020.</p></dd><dt>Saidi history ieee without major days 2019</dt><dd>170.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2019.</p></dd><dt>Saidi history ieee without major days 2018</dt><dd>357.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2018.</p></dd><dt>Saidi history ieee without major days 2017</dt><dd>186.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2017.</p></dd><dt>Saidi history ieee without major days 2016</dt><dd>198.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2016.</p></dd><dt>Saidi history ieee without major days 2015</dt><dd>193.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_without_major_days;Year 2015.</p></dd><dt>Saidi history ieee loss supply removed 2023</dt><dd>480.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saidi history ieee loss supply removed 2022</dt><dd>877.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saidi history ieee loss supply removed 2021</dt><dd>210.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saidi history ieee loss supply removed 2020</dt><dd>151.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saidi history ieee loss supply removed 2019</dt><dd>329.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saidi history ieee loss supply removed 2018</dt><dd>732.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saidi history ieee loss supply removed 2017</dt><dd>1782.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saidi history ieee loss supply removed 2016</dt><dd>187.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saidi history ieee loss supply removed 2015</dt><dd>179.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history ieee all events 2023</dt><dd>2.25 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2023.</p></dd><dt>Saifi history ieee all events 2022</dt><dd>2.44 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2022.</p></dd><dt>Saifi history ieee all events 2021</dt><dd>1.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2021.</p></dd><dt>Saifi history ieee all events 2020</dt><dd>1.63 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2020.</p></dd><dt>Saifi history ieee all events 2019</dt><dd>1.96 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2019.</p></dd><dt>Saifi history ieee all events 2018</dt><dd>3.39 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2018.</p></dd><dt>Saifi history ieee all events 2017</dt><dd>2.61 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2017.</p></dd><dt>Saifi history ieee all events 2016</dt><dd>1.55 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2016.</p></dd><dt>Saifi history ieee all events 2015</dt><dd>1.76 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_all_events;Year 2015.</p></dd><dt>Saifi history ieee without major days 2023</dt><dd>1.38 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2023.</p></dd><dt>Saifi history ieee without major days 2022</dt><dd>1.95 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2022.</p></dd><dt>Saifi history ieee without major days 2021</dt><dd>1.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2021.</p></dd><dt>Saifi history ieee without major days 2020</dt><dd>1.63 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2020.</p></dd><dt>Saifi history ieee without major days 2019</dt><dd>1.49 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2019.</p></dd><dt>Saifi history ieee without major days 2018</dt><dd>2.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2018.</p></dd><dt>Saifi history ieee without major days 2017</dt><dd>1.63 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2017.</p></dd><dt>Saifi history ieee without major days 2016</dt><dd>1.55 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2016.</p></dd><dt>Saifi history ieee without major days 2015</dt><dd>1.76 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_without_major_days;Year 2015.</p></dd><dt>Saifi history ieee loss supply removed 2023</dt><dd>2.04 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saifi history ieee loss supply removed 2022</dt><dd>2.26 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saifi history ieee loss supply removed 2021</dt><dd>1.75 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saifi history ieee loss supply removed 2020</dt><dd>1.56 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saifi history ieee loss supply removed 2019</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saifi history ieee loss supply removed 2018</dt><dd>2.86 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saifi history ieee loss supply removed 2017</dt><dd>2.49 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saifi history ieee loss supply removed 2016</dt><dd>1.37 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saifi history ieee loss supply removed 2015</dt><dd>1.53 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history ieee all events 2023</dt><dd>216.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2023.</p></dd><dt>Caidi history ieee all events 2022</dt><dd>374.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2022.</p></dd><dt>Caidi history ieee all events 2021</dt><dd>112.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2021.</p></dd><dt>Caidi history ieee all events 2020</dt><dd>97.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2020.</p></dd><dt>Caidi history ieee all events 2019</dt><dd>170.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2019.</p></dd><dt>Caidi history ieee all events 2018</dt><dd>274.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2018.</p></dd><dt>Caidi history ieee all events 2017</dt><dd>687.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2017.</p></dd><dt>Caidi history ieee all events 2016</dt><dd>128.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2016.</p></dd><dt>Caidi history ieee all events 2015</dt><dd>109.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_all_events;Year 2015.</p></dd><dt>Caidi history ieee without major days 2023</dt><dd>148.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2023.</p></dd><dt>Caidi history ieee without major days 2022</dt><dd>91.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2022.</p></dd><dt>Caidi history ieee without major days 2021</dt><dd>112.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2021.</p></dd><dt>Caidi history ieee without major days 2020</dt><dd>97.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2020.</p></dd><dt>Caidi history ieee without major days 2019</dt><dd>114.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2019.</p></dd><dt>Caidi history ieee without major days 2018</dt><dd>152.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2018.</p></dd><dt>Caidi history ieee without major days 2017</dt><dd>114.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2017.</p></dd><dt>Caidi history ieee without major days 2016</dt><dd>128.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2016.</p></dd><dt>Caidi history ieee without major days 2015</dt><dd>109.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_without_major_days;Year 2015.</p></dd><dt>Caidi history ieee loss supply removed 2023</dt><dd>235.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Caidi history ieee loss supply removed 2022</dt><dd>388.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Caidi history ieee loss supply removed 2021</dt><dd>120.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Caidi history ieee loss supply removed 2020</dt><dd>96.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Caidi history ieee loss supply removed 2019</dt><dd>173.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Caidi history ieee loss supply removed 2018</dt><dd>256.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Caidi history ieee loss supply removed 2017</dt><dd>715.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Caidi history ieee loss supply removed 2016</dt><dd>136.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Caidi history ieee loss supply removed 2015</dt><dd>117.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"},{"id":"power-any-reliability-2025-vt","html":"<article><h3>Vermont historical any-method distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 years2025 and2024.</p></dd><dt>Any reliability basis</dt><dd>EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 header and definitions.</p></dd><dt>Any coverage 2025</dt><dd>89.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;coverage;Year 2025.</p></dd><dt>Any coverage 2024</dt><dd>87.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;coverage;Year 2024.</p></dd><dt>Any all events saidi 2025</dt><dd>262.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_saidi;Year 2025.</p></dd><dt>Any all events saidi 2024</dt><dd>696.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_saidi;Year 2024.</p></dd><dt>Any all events saifi 2025</dt><dd>1.70 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_saifi;Year 2025.</p></dd><dt>Any all events saifi 2024</dt><dd>2.52 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_saifi;Year 2024.</p></dd><dt>Any all events caidi 2025</dt><dd>154.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_caidi;Year 2025.</p></dd><dt>Any all events caidi 2024</dt><dd>276.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;all_events_caidi;Year 2024.</p></dd><dt>Any without major events saidi 2025</dt><dd>184.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_saidi;Year 2025.</p></dd><dt>Any without major events saidi 2024</dt><dd>275.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_saidi;Year 2024.</p></dd><dt>Any without major events saifi 2025</dt><dd>1.56 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_saifi;Year 2025.</p></dd><dt>Any without major events saifi 2024</dt><dd>1.66 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_saifi;Year 2024.</p></dd><dt>Any without major events caidi 2025</dt><dd>118.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_caidi;Year 2025.</p></dd><dt>Any without major events caidi 2024</dt><dd>165.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Vermont row;without_major_events_caidi;Year 2024.</p></dd><dt>Saidi history any all events 2023</dt><dd>744.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2023.</p></dd><dt>Saidi history any all events 2022</dt><dd>963.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2022.</p></dd><dt>Saidi history any all events 2021</dt><dd>313.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2021.</p></dd><dt>Saidi history any all events 2020</dt><dd>255.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2020.</p></dd><dt>Saidi history any all events 2019</dt><dd>443.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2019.</p></dd><dt>Saidi history any all events 2018</dt><dd>897.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2018.</p></dd><dt>Saidi history any all events 2017</dt><dd>873.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2017.</p></dd><dt>Saidi history any all events 2016</dt><dd>359.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2016.</p></dd><dt>Saidi history any all events 2015</dt><dd>204.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_all_events;Year 2015.</p></dd><dt>Saidi history any without major events 2023</dt><dd>221.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2023.</p></dd><dt>Saidi history any without major events 2022</dt><dd>267.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2022.</p></dd><dt>Saidi history any without major events 2021</dt><dd>262.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2021.</p></dd><dt>Saidi history any without major events 2020</dt><dd>255.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2020.</p></dd><dt>Saidi history any without major events 2019</dt><dd>170.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2019.</p></dd><dt>Saidi history any without major events 2018</dt><dd>262.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2018.</p></dd><dt>Saidi history any without major events 2017</dt><dd>246.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2017.</p></dd><dt>Saidi history any without major events 2016</dt><dd>273.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2016.</p></dd><dt>Saidi history any without major events 2015</dt><dd>205.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Vermont row;any_without_major_events;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history any all events 2023</dt><dd>2.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2023.</p></dd><dt>Saifi history any all events 2022</dt><dd>2.62 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2022.</p></dd><dt>Saifi history any all events 2021</dt><dd>2.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2021.</p></dd><dt>Saifi history any all events 2020</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2020.</p></dd><dt>Saifi history any all events 2019</dt><dd>1.98 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2019.</p></dd><dt>Saifi history any all events 2018</dt><dd>2.62 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2018.</p></dd><dt>Saifi history any all events 2017</dt><dd>2.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2017.</p></dd><dt>Saifi history any all events 2016</dt><dd>1.86 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2016.</p></dd><dt>Saifi history any all events 2015</dt><dd>1.67 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_all_events;Year 2015.</p></dd><dt>Saifi history any without major events 2023</dt><dd>1.58 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2023.</p></dd><dt>Saifi history any without major events 2022</dt><dd>1.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2022.</p></dd><dt>Saifi history any without major events 2021</dt><dd>2.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2021.</p></dd><dt>Saifi history any without major events 2020</dt><dd>1.93 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2020.</p></dd><dt>Saifi history any without major events 2019</dt><dd>1.47 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2019.</p></dd><dt>Saifi history any without major events 2018</dt><dd>1.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2018.</p></dd><dt>Saifi history any without major events 2017</dt><dd>1.89 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2017.</p></dd><dt>Saifi history any without major events 2016</dt><dd>1.80 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2016.</p></dd><dt>Saifi history any without major events 2015</dt><dd>1.75 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Vermont row;any_without_major_events;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history any all events 2023</dt><dd>316.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2023.</p></dd><dt>Caidi history any all events 2022</dt><dd>367.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2022.</p></dd><dt>Caidi history any all events 2021</dt><dd>151.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2021.</p></dd><dt>Caidi history any all events 2020</dt><dd>134.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2020.</p></dd><dt>Caidi history any all events 2019</dt><dd>224.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2019.</p></dd><dt>Caidi history any all events 2018</dt><dd>342.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2018.</p></dd><dt>Caidi history any all events 2017</dt><dd>362.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2017.</p></dd><dt>Caidi history any all events 2016</dt><dd>193.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2016.</p></dd><dt>Caidi history any all events 2015</dt><dd>122.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_all_events;Year 2015.</p></dd><dt>Caidi history any without major events 2023</dt><dd>140.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2023.</p></dd><dt>Caidi history any without major events 2022</dt><dd>136.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2022.</p></dd><dt>Caidi history any without major events 2021</dt><dd>127.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2021.</p></dd><dt>Caidi history any without major events 2020</dt><dd>132.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2020.</p></dd><dt>Caidi history any without major events 2019</dt><dd>116.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2019.</p></dd><dt>Caidi history any without major events 2018</dt><dd>137.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2018.</p></dd><dt>Caidi history any without major events 2017</dt><dd>130.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2017.</p></dd><dt>Caidi history any without major events 2016</dt><dd>151.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2016.</p></dd><dt>Caidi history any without major events 2015</dt><dd>117.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Vermont row;any_without_major_events;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"}]}