Atlas / Idaho / Pocatello Idaho · City edition Pocatello data center record . Explore documented data center records linked to Pocatello.
About map locations Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.
Open the full Idaho map · State source notes
Compilation dated October 23, 2026: 2 Atlas records linked to Pocatello, Idaho, drawing on 5 public source links. Records can describe sites, campuses, buildings or proposals. Records and source links . Download this data: CSV / JSON .
2 research records
0 status supported
2 status still open
0 mapped references
Reset filters
2 records Status
0 reviewed map references: solid dots mark a street address or exact point, faded dots mark an approximate area. Rings are county level only, with no site point confirmed.
FBI Grey Wolf Data Center Pocatello · Bannock · Source context reviewed Status unclear Lex Developments AI Data Center (former Hoku polysilicon site) Pocatello · Bannock · Source context reviewed Status unclear
No records match these filters. Use Reset filters to start again.
Concerns and records. 1 documented item. Counts describe documentation, not harm or severity. One item can have more than one category.
Land use and zoning: 1 · Power and electric rates: 1 · Water use: 1 · Wildlife, wetlands and stormwater: 1
This is a bounded source collection. Missing items do not establish that no concern was raised. A case disposition does not establish facility operating status or resolve the underlying allegations.
View 1 documented items News report Water use · Power and electric rates · Land use and zoning · Wildlife, wetlands and stormwater
Boise State Public Radio reported Sierra Club's concerns about water, electricity, wildlife habitat and use of public land for the Rhea Data proposal near Blacks Creek Reservoir. The article also records BLM's account of plans for public input. These are reported concerns and agency statements, not an independently inspected final environmental review, actual resource impacts or a granted project approval. All later permit and public-comment outcomes are unknown in this review.
Record status: Unknown. The current disposition of the documented concerns and original federal review is unknown in this bounded report review. Anticipated future scoping and promised public input do not establish a completed review, permit approval, resource measurement or resolution of every concern.
Event date Not established
Source publication date September 21, 2026
Disposition date Not established
Concern sources checked October 18, 2026 The article reports interviews and a newly reported proposal without one independently verified exact concern filing or hearing day. Monday/Friday references are not converted to guessed event dates; the event remains unknown. The original article displays September 21, 2026 at 3:43 p.m. MDT. Publication is separate from unverified application, interview and future scoping dates.
Raised or recorded by Boise State Public Radio.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.
Report a correction · Link to this item
Community concerns tracker
Companies and counties. Company names and sourced roles keep their separate labels in each record.
No company page is linked to these records yet.
No published county page is linked to these records yet.
Rules and source checks. These are county source reviews linked to the retained records. They do not establish municipal boundaries, city zoning, parcel permission or current compliance.
Power and water. Each figure keeps its measure, basis, date and sources. Forecasts, utility requests, generation and IT capacity are different. These figures are not added into a county total.
No separately typed power or water fact is retained for this county cohort yet. That means unknown, not zero use.
The dated record. The retained event log distinguishes announcements, scheduled dates and status-source checks. A review date is not an opening day. A target never becomes a completed event merely because time passes.
Recorded events and announcements. September 17, 2026 Lex Developments AI Data Center (former Hoku polysilicon site) The City October 1 consent packet reports that Council voted September 17, 2026 to affirm the application denial and separately waive the waiting period for a new application. The draft signature and date lines remain blank. This reported vote does not approve a replacement application, certify a final executed instrument or establish physical shutdown.
May 18, 2026 Lex Developments AI Data Center (former Hoku polysilicon site) The City published October 1 consent packet reports that the Hearing Examiner denied the Lex conditional use application May 18, 2026 and issued an amended denial May 19. This is the dated denial account, not a computing shutdown, a final court judgment or the exact signature day of the later draft Council instrument.
Questions about these records How many records are listed for Pocatello, Idaho? In the October 23, 2026 compilation, 2 research records are linked to Pocatello, Idaho. This count is not a count of distinct operating buildings. Records and source links .
How many records have an unclear status? In the October 23, 2026 compilation, 2 of 2 records retain an unclear status. Each record links to the evidence for its own stage. Records and source links .
How many records have a reviewed map reference? In the October 23, 2026 compilation, 0 records have a reviewed map reference, 2 show only a county area and 0 have no map point. Street references and approximate areas do not certify a roof or parcel. Records and source links .