Rules and source checks.
The county review below is separate from site-specific conditions and municipal or township zoning. It does not establish parcel permission or current compliance.
Los Angeles County
Policy context found · Checked October 17, 2026.
The county project page says Title 22 does not currently contain regulations specific to data centers. The Board directed a study and outreach on April 14, 2026; that direction is not an adopted ban or a new zoning standard.
This checked project page concerns unincorporated Los Angeles County. Municipal rules, the complete code and subsequent individual actions have not been exhaustively reviewed.
Official source 1
The dated record.
The retained event log distinguishes announcements, scheduled dates and status-source checks. A review date is not an opening day. A target never becomes a completed event merely because time passes.
Recorded events and announcements.
- Vernon LA Campus (with Goodman Group)
DataBank announced its Vernon joint venture with Goodman and prospective capacity delivery from December 2026 through September 2027. This is an announcement, not completed opening, energization or financial close.
View 8 status source checks
Status source checks.
- Prime Data Centers LAX01
Primary source review checked October 16, 2026. Prime’s current LAX01 property table explicitly labels component LAX01-01 operational and leased. The status is the operator’s current report, captured as an extracted public-page observation rather than raw HTML. It does not establish full delivered or occupied IT load, commissioning of all halls or precise surveyed geometry.
- Equinix LA4
Current operator-listed LA4 colocation service context. A named facility page and published specifications support an operating service component; individual expansions, live availability and full campus completion are not independently inspected.
- Equinix LA3
Current operator-listed LA3 colocation service context. A named facility page and published specifications support an operating service component; individual expansions, live availability and full campus completion are not independently inspected.
- Digital Realty LAX12
Digital Realty currently markets colocation and connectivity services under LAX12. This supports an operating service component in the existing research context, not complete campus delivery, full-building operation, legal ownership, present vacancy or a commissioned IT-load figure.
- Vernon LA Campus (with Goodman Group)
Vernon development/construction context, with DataBank planned as operator and Goodman developing the site. The April 7, 2026 announcement forecasts first 6 MW in December 2026 and remaining 26 MW through September 2027. Generic present-tense facility/service language is not evidence of operation; actual shell readiness, energization and opening are unverified.
- CoreSite LA2 - Los Angeles, CA
Current CoreSite LA2 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime.
- CoreSite LA1 (One Wilshire)
Current CoreSite LA1 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime.
- Goodman Energy Park Data Center
Proposed Goodman Energy Park two-building context with the associated CEC backup-generation exemption proceeding listed Under Review. This describes a regulatory proposal, not verified current construction, occupancy or operation. Final local land-use, building and air permissions are not established.