5 documented items. Counts describe documentation, not harm or severity. One item can have more than one category.
Air and generators: 2 · Land use and zoning: 3 · Noise: 2 · Other: 2 · Power and electric rates: 1 · Water use: 4
This is a bounded source collection. Missing items do not establish that no concern was raised. A case disposition does not establish facility operating status or resolve the underlying allegations.
View 5 documented items Permit and comment Air and generators
Utah Division of Air Quality lists air-permit application N159410011 for Stadion LLC at the Eagle Mountain data-center campus, received April 10, 2026. Its public row shows draft permitting documents under review, with a separate August 7 update field. This is an application-review record, not an issued permit, an inspection finding or verification of operation or compliance.
Record status: Pending. Utah Division of Air Quality currently lists draft permitting documents under review for the named application. Pending applies only to that listed review step; an issued permit, later original determination, actual operation and present air compliance have not been established in this bounded review. The exact day this draft-review step began is unknown; the August 7 update field is not substituted for a transition day.
Event date April 10, 2026
Source publication date Not established
Disposition date Not established
Concern sources checked October 18, 2026 The agency table labels April 10, 2026 as NOI received. This is an application-receipt event, not a hearing, public comment, issuance, startup or violation date. No first public posting day for the changing agency table or application is established. Its most-recent-update field is not substituted for a publication date.
Raised or recorded by Utah Division of Air Quality.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.
Report a correction · Link to this item
Regulator record Water use · Air and generators · Noise · Land use and zoning
Iron County Planning Commission recorded staff discussion of public concerns about Antelope water use and gas leakage, together with noise and possible mitigation conditions. Its minutes explicitly describe this as a discussion item with no action and no public hearing for that item. This documents the planning concerns and draft conditions, not acquired water rights, adopted project conditions, measured impacts or a violation finding.
Record status: Unknown. The planning concern is documented in an original County record. Final individual application disposition, later resolution and measured conditions are unknown in this bounded review.
Event date April 2, 2026
Source publication date Not established
Disposition date Not established
Concern sources checked October 23, 2026 The original minutes identify the April 2, 2026 meeting. This is the documented planning discussion day, not the first day residents raised concerns. Exact first online publication day is not established.
Raised or recorded by Iron County Planning Commission.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.
Report a correction · Link to this item
Public concern on the record Juab County Water use
Nephi City Council recorded a desire to limit excessive water use by computing development and require projects to provide their own water resources during development in the Industrial 4 ordinance recitals. These are institutional resource policy concerns rather than measured water depletion, a violation, an allegation against an individual facility or a Countywide prohibition. A separate Industrial 1 modular computing pathway remains distinct, and adopting zoning text does not establish resolution of the underlying resource question.
Record status: Unknown. The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.
Event date December 2, 2025
Source publication date Not established
Disposition date Not established
Concern sources checked October 24, 2026 The signed original records December 2, 2025 passage and recording. Its certificate states December 3 publication or posting, while the State notice was posted December 4. Those distinct source dates are not harmonized and do not establish the first concern day. The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.
Raised or recorded by Nephi City Council.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.
Report a correction · Link to this item
Public concern on the record Land use and zoning · Water use · Noise · Power and electric rates · Other
Box Elder County said in its original Stratos fact sheet that it received supportive and critical submissions and that recurring topics included water, noise, community effects, electricity prices and public finances. The County published assurances about the proposed project in response. These are attributed County accounts rather than direct resident testimony, independently measured impacts, verified unique resident totals or an operator response.
Record status: Unknown. The County reports mixed supportive and critical feedback and publishes its own responses. This bounded account does not independently establish the complete comment history, current concern resolution, representative community opinion or measured harm.
Event date Not established
Source publication date Not established
Disposition date Not established
Concern sources checked October 24, 2026 The original current County fact sheet does not independently date the first public submission or individual recurring concern. Exact event dates remain unknown. No exact fact sheet publication day is independently printed in the read body. The retrieval day is not a public concern event or publication day.
Raised or recorded by Box Elder County.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.
Report a correction · Link to this item
Regulator record Water use · Land use and zoning · Other
Juab County Planning Commission recorded concerns about water resources, effects on agricultural users, future tenant demand and the proposed industrial use in Dog Valley. The body documents differing views and a recommendation to County Commissioners. This is an attributed planning discussion, not a final rezoning decision, a finding of actual groundwater effects or independent confirmation of project benefits.
Record status: Unknown. The planning concern is documented in an original County record. Final individual application disposition, later resolution and measured conditions are unknown in this bounded review.
Event date Not established
Source publication date Not established
Disposition date Not established
Concern sources checked October 23, 2026 The cover and opening give November 19, 2025 while the printed page 4 header gives September 17, 2025. The conflicting source dates remain unresolved, so no exact concern event day is adopted. Exact first online publication day is not established.
Raised or recorded by Juab County Planning Commission.
Company statement published by an agency or court. Summit Group Holdings stated in the County published minutes that planned closed loop cooling and potentially delivered water would limit local consumptive use. These are recorded applicant representations, not verified water demand, a legal water entitlement or measured protection of neighboring supplies.
The original minutes identify the company representative as speaking for this rezoning proposal. No current operating role is inferred.
Response publication: Not established. Response sources checked: October 23, 2026.
Report a correction · Link to this item