Washington data center generators and air permits.
7 sourced items are documented. Permit records do not establish installed equipment or actual operation.
Historical record, Permit issued. Checked: October 28, 2026.
Evidence applies only to the subjects and dates in the linked sources. State context does not assign a tariff, permit or quantity to every facility.
Open the Washington data center map.
Sourced findings.
CyrusOne Quincy, D Street
One dated campus authorization. Equipment counts and permit limits establish neither actual operation nor observed emissions.
Washington Department of Ecology. Source: January 22, 2026. Checked: October 23, 2026.Full source details load when opened.
Sabey Intergate Quincy, M Street
One dated campus authorization. Equipment counts and permit limits establish neither actual operation nor observed emissions.
Washington Department of Ecology. Source: April 6, 2026. Checked: October 23, 2026.Full source details load when opened.
H5 Quincy, M Street
One dated campus authorization. The inventory and permit ceilings do not establish physical installation, current operation, measured emissions or a complete state count.
Open the matched campus record. The match is to the named campus at its published street address; an exact building or parcel match is not established.
Washington Department of Ecology. Source: November 26, 2024. Checked: October 23, 2026.Full source details load when opened.
Microsoft Columbia Quincy, Port Industrial Parkway
One dated campus authorization. The inventory and permit ceilings do not establish physical installation, current operation, measured emissions or a complete state count.
Washington Department of Ecology. Source: March 28, 2025. Checked: October 23, 2026.Full source details load when opened.
Vantage Quincy combined generator approval order
Dated Washington permit at the named Quincy premises. Sixty one is the combined permitted inventory, including forty four additions. Conditional hours, deadlines, source conflicts and later unknowns remain separate from actual construction, emissions or operation.
Washington Department of Ecology. Source: August 29, 2023. Checked: October 23, 2026.Full source details load when opened.
Washington historical2023 electricity-generation emissions
EPA eGRID2023 revision2 state electricity-generation emissions context,ST23 worksheet. Historical2023,not current2026 conditions or data center facility emissions. Annual NOx,SO2 andCO2 totals in source tons are distinct from source-reported total output rates in lb/MWh;CO2 is not CO2 equivalent. Annual net generation is MWh,not installed capacity or customer use. Rates are not marginal emissions,ambient concentrations,health effects or emissions factors allocated to a data center. No tons-to-tonnes conversion,rate recomputation,facility join or causal data center inference. State generation context does not establish the mix delivered to consumers. Puerto Rico source row is outside this51state/DC review,not absence.
U.S. Environmental Protection Agency. Source: Publication date not stated. Checked: October 27, 2026.Full source details load when opened.
Washington historical power and useful thermal emissions2025 and2024
EIA Table9.5 historical state2025 and2024 emissions estimates from energy consumption at conventional power and combined-heat-and-power plants. Includes electricity generation AND production of useful thermal output,not electricity-only emissions. Source unit is thousand metric tons,not eGRID source tons,pounds,CO2equivalent or emission intensity. Source CO2,SO2 and NOx are distinct pollutants,not summed as one climate measure. Displayed zero values may represent small values rounded to zero;no absence or zero-emissions certification. Retain displayed HTML precision;source says Excel cells provide additional precision,not adopted here. No direct eGRID trend or data center allocation,marginal emissions,ambient concentration,health risk,permit compliance,current2026 activity or Native facility joins.
U.S. Energy Information Administration. Source: October 21, 2026. Checked: October 28, 2026.Full source details load when opened.
Explore county records.
Explore data center records.
These records are in Washington. State evidence does not establish an individual record match.
- Actapio East Wenatchee Data Center
- Atlas Agro Richland Data Center Campus
- AWS Wallula Gap Campus
- Blue Fern Cle Elum Data Center
- Centeris South Hill Campus (SH1/SH2)
- Centersquare Lynnwood SE1
- CyrusOne PNW1
- Dallesport Server Farm (Webster Orchards / Williams Ranch site)
- Digital Fortress Lynnwood (SEA1)
- Digital Realty SEA1 (Intergate Seattle-East, Bldg 4)
- Energizer Data Center (BPA L0493 / L0497)
- Energizer II Data Center (BPA L0702)
Find the full record collection on the state map.
Updated . What changed: Latest source review in this evidence collection. It does not establish a site outcome.