Rules and source checks.
The county review below is separate from site-specific conditions and municipal or township zoning. It does not establish parcel permission or current compliance.
Polk County
Source access limited · Checked October 17, 2026.
The automated check stopped because the official source robots policy returned HTTP 403. The identified county zoning PDF was not captured or reviewed as a complete current code.
No conclusion about data-center restrictions, permission or absence of law is supported by this access result. County and incorporated-city jurisdiction and the latest adopted code still require primary-source review.
Access-check target
Power and water.
Each figure keeps its measure, basis, date and sources. Forecasts, utility requests, generation and IT capacity are different. These figures are not added into a county total.
No separately typed power or water fact is retained for this county cohort yet. That means unknown, not zero use.
The dated record.
The retained event log distinguishes announcements, scheduled dates and status-source checks. A review date is not an opening day. A target never becomes a completed event merely because time passes.
View 1 status source checks
Status source checks.
- Meta Altoona Data Center Campus
Primary source review checked October 16, 2026. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.