The county review below is separate from site-specific conditions and municipal or township zoning. It does not establish parcel permission or current compliance.
Storey County
None found in checked sources · Checked October 17, 2026.
The checked county guidance identifies Title 17 as its zoning code. The planning-projects page explicitly hosts draft updates; those drafts are not treated as enacted amendments. No data-center-specific restriction was established from these two guidance pages.
The complete current code, development agreements and project-specific approvals require separate review. A Tahoe Reno Industrial Center or individual conditional-use approval is not automatically a countywide standard.
Official source 1 · Official source 2
The dated record.
The retained event log distinguishes announcements, scheduled dates and status-source checks. A review date is not an opening day. A target never becomes a completed event merely because time passes.
Scheduled context.
- EdgeCore Reno Data Center Campus
Scheduled event: Storey County notice lists an EdgeCore topping-off and ribbon-cutting function at 3615 USA Parkway, McCarran, on November 18, 2026. This is a future ceremony, not proof of opening, commissioning or full-campus delivery. The county index links two PDFs under swapped labels; the cited document contains the actual EdgeCore notice.
View 2 status source checks
Status source checks.
- Switch CITADEL Campus
Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon.
- Google Data Center
An operating component is supported at Google’s named Storey County, Nevada location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.