Rules and source checks.
The county review below is separate from site-specific conditions and municipal or township zoning. It does not establish parcel permission or current compliance.
Licking County
None found in checked sources · Checked October 17, 2026.
No countywide data-center-specific rule was identified in the checked planning and zoning-routing pages. The county explains that township zoning ordinances are prepared, implemented and enforced by the townships.
The county warns that linked township material may not be current. Individual township and city codes have not all been reviewed. This routing check cannot establish a countywide ban, permission or absence of local restrictions.
Official source 1 · Official source 2
Power and water.
Each figure keeps its measure, basis, date and sources. Forecasts, utility requests, generation and IT capacity are different. These figures are not added into a county total.
No separately typed power or water fact is retained for this county cohort yet. That means unknown, not zero use.
The dated record.
The retained event log distinguishes announcements, scheduled dates and status-source checks. A review date is not an opening day. A target never becomes a completed event merely because time passes.
View 1 status source checks
Status source checks.
- Meta Prometheus
Primary source review checked October 16, 2026. The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms. Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.