Maine data center generators and air permits.
3 sourced items are documented. Permit records do not establish installed equipment or actual operation.
Enacted, Historical record. Checked: October 28, 2026.
Evidence applies only to the subjects and dates in the linked sources. State context does not assign a tariff, permit or quantity to every facility.
Open the Maine data center map.
Sourced findings.
Maine generator applicability and prohibited nonemergency uses
Chapter169 sections1 through5 and effective date reviewed. Stack section not adopted; linked licensing rules,individual licenses and applicable federal updates not reviewed.
Maine Secretary of State and Department of Environmental Protection. Source: October 9, 2022. Checked: October 25, 2026.Full source details load when opened.
Maine historical2023 electricity-generation emissions
EPA eGRID2023 revision2 state electricity-generation emissions context,ST23 worksheet. Historical2023,not current2026 conditions or data center facility emissions. Annual NOx,SO2 andCO2 totals in source tons are distinct from source-reported total output rates in lb/MWh;CO2 is not CO2 equivalent. Annual net generation is MWh,not installed capacity or customer use. Rates are not marginal emissions,ambient concentrations,health effects or emissions factors allocated to a data center. No tons-to-tonnes conversion,rate recomputation,facility join or causal data center inference. State generation context does not establish the mix delivered to consumers. Puerto Rico source row is outside this51state/DC review,not absence.
U.S. Environmental Protection Agency. Source: Publication date not stated. Checked: October 27, 2026.Full source details load when opened.
Maine historical power and useful thermal emissions2025 and2024
EIA Table9.5 historical state2025 and2024 emissions estimates from energy consumption at conventional power and combined-heat-and-power plants. Includes electricity generation AND production of useful thermal output,not electricity-only emissions. Source unit is thousand metric tons,not eGRID source tons,pounds,CO2equivalent or emission intensity. Source CO2,SO2 and NOx are distinct pollutants,not summed as one climate measure. Displayed zero values may represent small values rounded to zero;no absence or zero-emissions certification. Retain displayed HTML precision;source says Excel cells provide additional precision,not adopted here. No direct eGRID trend or data center allocation,marginal emissions,ambient concentration,health risk,permit compliance,current2026 activity or Native facility joins.
U.S. Energy Information Administration. Source: October 21, 2026. Checked: October 28, 2026.Full source details load when opened.
Explore data center records.
These records are in Maine. State evidence does not establish an individual record match.
- CENTRA Digital Interconnect -- 340 Cumberland (PMW01)
- Loring LiquidCool Data Center (Green 4 Maine Campus)
- MillCompute Bates Mill No. 3 AI Data Center
- Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)
- Sanford Woods Data Center
- Sentinel Data Centers Androscoggin Mill Campus, Jay
- Wiscasset Data Center (Old Ferry Road Site)
Find the full record collection on the state map.
Updated . What changed: Latest source review in this evidence collection. It does not establish a site outcome.