Community concerns.

See what public records and reporting say about data center concerns.

Documented items by state.Select a state, or use the state menu. Shading shows documented items, not harm. Missing items do not establish that no concern exists.Alabama: 2 documented itemsAlaska: 2 documented itemsArizona: 1 documented itemsArkansas: 1 documented itemsCalifornia: 8 documented itemsColorado: 1 documented itemsConnecticut: 1 documented itemsDelaware: 1 documented itemsDistrict of Columbia: 0 documented itemsFlorida: 1 documented itemsGeorgia: 4 documented itemsHawaii: 1 documented itemsIdaho: 1 documented itemsIllinois: 7 documented itemsIndiana: 5 documented itemsIowa: 3 documented itemsKansas: 2 documented itemsKentucky: 3 documented itemsLouisiana: 3 documented itemsMaine: 1 documented itemsMaryland: 3 documented itemsMassachusetts: 1 documented itemsMichigan: 3 documented itemsMinnesota: 3 documented itemsMississippi: 1 documented itemsMissouri: 5 documented itemsMontana: 1 documented itemsNebraska: 2 documented itemsNevada: 3 documented itemsNew Hampshire: 1 documented itemsNew Jersey: 1 documented itemsNew Mexico: 3 documented itemsNew York: 1 documented itemsNorth Carolina: 2 documented itemsNorth Dakota: 1 documented itemsOhio: 2 documented itemsOklahoma: 2 documented itemsOregon: 2 documented itemsPennsylvania: 1 documented itemsRhode Island: 1 documented itemsSouth Carolina: 3 documented itemsSouth Dakota: 1 documented itemsTennessee: 2 documented itemsTexas: 3 documented itemsUtah: 1 documented itemsVermont: 0 documented itemsVirginia: 2 documented itemsWashington: 1 documented itemsWest Virginia: 5 documented itemsWisconsin: 2 documented itemsWyoming: 1 documented items
documented items, not harm

Newest.

The 10 most recent documented items.

  1. MCNI Concord Township Data Center (rezoning denied)Iowa · News report ·
  2. NorthMark Strategies Spartanburg High-Performance Computing CenterSouth Carolina · Legal action ·
  3. Project Spring (Sand Springs)Oklahoma · News report ·
  4. Goodman Energy Park Data CenterCalifornia · Public concern on the record ·
  5. Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)Ohio · News report ·
  6. CyrusOne CHI1-CHI3 (Aurora)Illinois · Public concern on the record ·
  7. Crusoe Warrenton CampusMissouri · Permit and comment ·
  8. Cook Inlet Subsea-Compute & Infrastructure HubAlaska · News report ·
  9. Project CannoliMichigan · Public concern on the record ·
  10. Project Tango AI Data Center CampusFlorida · News report ·

Browse records.

108 documented items in this collection.

Permit and comment

Serverfarm Covington Data Center (Hazelbrand Road)

Georgia · Latest recorded activity:

Read record

Air and generators

Georgia Environmental Protection Division issued air permit 4911-217-0080-S-01-0 for the VoltaGrid prime-power generation component serving ATL2 at 10835 Hazelbrand Road. The signed permit and agency narrative document a conditional air authorization, not verified operation, all local approvals or disposition of earlier construction allegations. The final agency addendum treats the two facilities as one air-permitting source while retaining separate equipment permits; this does not merge Atlas identities.

Record status: Resolved. Georgia Environmental Protection Division issued the named air permit. Resolved applies only to this permit action; the outcome of earlier construction allegations, actual operation and present compliance are not established.

Event date
Source publication date
Not established
Disposition date
Concern sources checked

The signed original permit cover and current agency registry identify September 18, 2026 as issuance. This is not an opening or all-permit completion date. The current registry labels an issuance date. A first public posting date for this permit or its evolving narrative is not established, so publication stays unknown.

Raised or recorded by Georgia Environmental Protection Division.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Legal action

Stargate Project Jupiter

New Mexico · Latest recorded activity:

Read record

Air and generators

Supreme Court of New Mexico recorded denial of New Energy Economy's mandamus request concerning the Project Jupiter air-permit proceeding and lifted its August stay. The order records that named court procedure without explanatory environmental findings. It does not establish an issued permit, actual emissions, present compliance or resolution of the separate county lawsuits.

Record status: Resolved. Supreme Court of New Mexico recorded denial of the named S-1-SC-41579 mandamus request and lifted its prior stay on September 17, 2026. Resolved applies only to that court procedure. No explanatory environmental merits findings, current permits, operational compliance or outcome of the distinct county cases were independently established.

Event date
Source publication date
Not established
Disposition date
Concern sources checked

The original September 17, 2026 court filing stamp and signed order establish the decision day for S-1-SC-41579. The prior stay was dated August 23; no petition filing date is invented. The original court PDF first-publication day is unknown. Its signature and court filing dates are decision dates. KANW separately published its report September 23, 2026.

Raised or recorded by Supreme Court of New Mexico.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Legal action

AWS Scioto Darby Campus

Ohio · Latest recorded activity:

Read record

Air and generators

City of Hilliard reported withdrawing its ERAC appeal of the air permit for AEP Ohio's natural-gas fuel cells serving the AWS Scioto Darby campus. The city described a carbon-dioxide modeling review and planned later monitoring while criticizing limited local review. This records the city's account, not a court merits ruling, measured air quality, all-pollutant safety finding or AWS diesel-generator permit.

Record status: Withdrawn. City of Hilliard reported withdrawing its own ERAC appeal. This is the city's published account, not a retained commission dismissal order, permit revocation, decision on alleged effects or proof of facility operation.

The exact disposition date is not established in the retained city announcement. Its September 15 publication date is separate from an ERAC withdrawal filing day.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The city reports a November 2025 appeal filing and a later withdrawal, but the exact filing and disposition days are not established in the retained announcements. The city release displays September 15, 2026 and the retained original JSON-LD gives that publication day. The identity-context release is dated October 21, 2025. Neither is a substitute for an unverified ERAC filing day.

Raised or recorded by City of Hilliard.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

News report

Servistar Realties Westfield Data Center Campus

Massachusetts · Latest recorded activity:

Read record

Water use · Water quality and discharge · Air and generators · Health

Western Mass News reported residents' water, air-quality and health concerns, alongside public support, at a Westfield meeting about Servistar Realties' proposed data center. The report says the developer requested a permit extension. These are outlet accounts, not measured impacts or a verified approval of that request.

Record status: Unknown. The present outcome of the documented concerns and permit-extension request is unknown in this bounded review. A reported request does not establish an approved extension, final environmental permits, completed construction or resolution of every concern.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The report describes a Tuesday-night meeting without an independently inspected original meeting record establishing its exact day. The event date remains unknown; a calendar date is not inferred from the article publication. The original article displays September 15, 2026 at 10:08 p.m. EDT. Its September 16 URL path does not replace the displayed local publication day.

Raised or recorded by Western Mass News.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Public concern on the record

Crusoe Hallam Data Center (Monolith Olive Creek campus)

Nebraska · Latest recorded activity:

Read record

Noise · Water use · Land use and zoning

Residents requested limits on data-center growth and further noise, water and setback rules during Hallam's September 14 board meeting, as recorded in the village minutes. The discussion specifically addressed Monolith and Crusoe's Olive Creek proposal. Later planning minutes record company commitments, while Nebraska Public Media reported a subsequent special-use approval. Those steps do not establish that every concern was resolved.

Record status: Unknown. The current outcome of the residents' requested growth limits and underlying concerns is unknown in this bounded review. Tabling the proposed resolution, a planning recommendation, company commitments and later reported permit approval do not establish enacted limits, implemented mitigation, measured conditions or resolution of every concern.

Event date
Source publication date
Not established
Disposition date
Not established
Concern sources checked

September 14, 2026 is the original board meeting date. The request was tabled at that meeting. Later recommendations and reported approval remain distinct events; no exact original later signed decision day is inferred. The village PDFs have no independently established first public posting date. Their September meeting dates and October URL folders are not publication dates. Nebraska Public Media published its later approval report October 6, 2026.

Raised or recorded by Residents.

Report a correction · Link to this item

News report

Stargate Lighthouse Campus

Wisconsin · Latest recorded activity:

Read record

Noise · Light · Water use · Power and electric rates · Traffic and construction · Land use and zoning

Wisconsin Public Radio reported water, electricity, noise and transmission-route questions at a September 10, 2026 community event for Port Washington's Lighthouse campus. Earlier reporting described construction-noise, light and traffic complaints and a city-announced hours change. These are outlet accounts, not measured impacts, a formal complaint case or proof that every concern was resolved.

Record status: Unknown. The current outcome of the documented resource and construction questions is unknown in this bounded review. A reported hours amendment and developer plans do not establish actual mitigation completion, measured noise or water conditions, current transmission approval or resolution of every concern.

Event date
Source publication date
Disposition date
Not established
Concern sources checked

The newer report's photo caption expressly identifies September 10, 2026 as the community conversation. This was a company informational event, not a formal agency hearing. The earlier reported hours amendment and its scheduled start are separate events. The original current report was published September 11, 2026 and updated that day; the construction-hours report was published March 20. The original company campus page has no independently established first publication day.

Raised or recorded by Wisconsin Public Radio.

Report a correction · Link to this item

Legal action

MARA Granbury Facility

Texas · Latest recorded activity:

Read record

Noise

Supreme Court of Texas issued an order denying the petition by MARA Holdings for a writ of mandamus in the proceeding linked to the Granbury nuisance case. The court also dismissed the motion to stay as moot. This procedural order does not decide the truth of the noise allegations or establish that the underlying concern was resolved.

Record status: Resolved. Supreme Court of Texas issued a denial of this mandamus petition on September 9, 2026. Resolved describes this procedural item only; it does not mean the nuisance merits or alleged effects have been resolved.

Event date
Source publication date
Disposition date
Concern sources checked

The orders page and official docket both date this procedural disposition September 9, 2026. The official Supreme Court orders page is dated September 9, 2026. First publication date of the dynamic docket is unknown.

Raised or recorded by Supreme Court of Texas.

Report a correction · Link to this item

News report

St. Joseph County

Indiana · Latest recorded activity:

Read record

Water quality and discharge

WVPE reported South Bend council questions about the composition of wastewater from an Amazon data center sent to the city's treatment plant. This records an outlet account of public questions. It does not establish the exact originating campus, contaminant levels, a discharge violation or a current permit outcome.

Record status: Unknown. The disposition of the reported water-composition questions is unknown in this bounded review. A proposed transparency bill and historical interview account do not establish a current water-quality result, permit decision, wrongdoing or resolution.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The outlet refers to an August 20 committee meeting and reported later conversations. The exact independently reviewed concern-event day remains unknown because original minutes and a filed utility inquiry were not inspected. The original report displays September 8, 2026 publication. That day is outlet publication, not an independently established discharge event, contamination finding or agency order.

Raised or recorded by WVPE.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Permit and comment

Cook Inlet Subsea-Compute & Infrastructure Hub

Alaska · Latest recorded activity:

Read record

Water quality and discharge · Noise · Heat · Land use and zoning · Wildlife, wetlands and stormwater · Other

Federal Energy Regulatory Commission recorded acceptance for filing of the DeepGreen Cook Inlet preliminary-permit application and invited comments through November 2, 2026. The notice concerns study priority for the East Foreland subsea-compute proposal. It does not grant a construction license or authorize land disturbance or entry onto others' property.

Record status: Unknown. The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.

Event date
Source publication date
Disposition date
Not established
Concern sources checked

The event is the exact dated original public record. The displayed original publication day is recorded separately from the event and source check.

Raised or recorded by Federal Energy Regulatory Commission.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Legal action

Clark County

Nevada · Latest recorded activity:

Read record

Land use and zoning · Water use · Air and generators · Wildlife, wetlands and stormwater

Interior Board of Land Appeals issued a September 1, 2026 stay of the federal Townsite data-center decision, consolidating Boulder City's and the environmental groups' appeals and expediting further review. The groups raised environmental-review, water, air and habitat concerns. The stay is an interim procedural ruling, not a final merits judgment or measured environmental finding.

Record status: Unknown. The current merits disposition is unknown in this bounded review. The September 1 order grants a stay and expedited consolidated review. It denies Boulder City's separate stay motion as moot because the granted stay already provides relief; it does not dismiss the city appeal, finally resolve every concern or establish that the project was withdrawn.

Event date
Source publication date
Disposition date
Not established
Concern sources checked

The actual signed order is dated September 1, 2026. It separately identifies Boulder City's July 23 appeal and the June 26 federal decision. Earlier group filing and later briefing are separate events; no completed later filing is inferred. The original group stay announcement was published September 1, 2026; its earlier appeal announcement was published July 27. The exact first public posting day of the original order PDF and city page is unknown; the order date is not assumed to be first publication.

Raised or recorded by Interior Board of Land Appeals.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Legal action

Ridgeline Data Center

West Virginia · Latest recorded activity:

Read record

Air and generators

Intermediate Court of Appeals of West Virginia dismissed Ridgeline-related appeal 26-ICA-92 on August 26, 2026 for being improvidently docketed, stating that review belongs in the Supreme Court of Appeals. This records the named court procedure, not a merits decision approving every environmental claim, current operation or the outcome of any later higher-court case.

Record status: Dismissed. Intermediate Court of Appeals of West Virginia dismissed only appeal 26-ICA-92 for being improvidently docketed, stating that review belongs in the Supreme Court of Appeals. Dismissed applies to that dated Intermediate Court procedure. It does not resolve all air-permit or disclosure merits, prove current compliance, dismiss every possible challenge or establish the present higher-court outcome.

Event date
Source publication date
Disposition date
Concern sources checked

The actual court order and electronic filing stamp both identify August 26, 2026. Earlier appeal-filing dates and any planned later refiling are separate; no accomplished higher-court filing is inferred. The exact original court PDF first posting day is unknown. The original linked WVPB follow-up was published August 31, 2026. A filename or filing stamp is not assumed to establish PDF publication.

Raised or recorded by Intermediate Court of Appeals of West Virginia.

Report a correction · Link to this item

Legal action

Ridgeline Data Center

West Virginia · Latest recorded activity:

Read record

Air and generators

Intermediate Court of Appeals of West Virginia dismissed Ridgeline-related appeal 25-ICA-391 on August 26, 2026 for lack of jurisdiction, with a separate discussion of moot draft-permit questions. This records the named court procedure, not a merits decision approving every environmental claim, current operation or the outcome of any later higher-court case.

Record status: Dismissed. Intermediate Court of Appeals of West Virginia dismissed only appeal 25-ICA-391 for lack of jurisdiction, with a separate discussion of moot draft-permit questions. Dismissed applies to that dated Intermediate Court procedure. It does not resolve all air-permit or disclosure merits, prove current compliance, dismiss every possible challenge or establish the present higher-court outcome.

Event date
Source publication date
Disposition date
Concern sources checked

The actual court order and electronic filing stamp both identify August 26, 2026. Earlier appeal-filing dates and any planned later refiling are separate; no accomplished higher-court filing is inferred. The exact original court PDF first posting day is unknown. The original linked WVPB follow-up was published August 31, 2026. A filename or filing stamp is not assumed to establish PDF publication.

Raised or recorded by Intermediate Court of Appeals of West Virginia.

Report a correction · Link to this item

Permit and comment

Amazon Web Services Richmond County Data Center Campus

North Carolina · Latest recorded activity:

Read record

Air and generators · Power and electric rates

North Carolina Department of Environmental Quality announced final air permits for Amazon's Hamlet backup engines and Duke Energy's temporary bridge-power engines, with additional testing, monitoring and reporting following public comments. The agency keeps the two permitted activities separate. Its announcement establishes a permit action, not measured emissions, actual campus operation or resolution of every community concern.

Record status: Resolved. North Carolina Department of Environmental Quality announced issuance of the two named air authorizations. Resolved applies only to that paired permitting action; actual operation, measured emissions, present compliance and the outcome of every community concern are not established.

Exact outcome date is not established for the signed permit issuances. August 28, 2026 is the verified agency announcement publication; the event and disposition dates remain unknown rather than substituting that publication or check day.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The agency announcement says the final permits had been issued, but exact signed issuance days were not independently established. Event date stays unknown; the announcement day and originally scheduled hearing are not substituted. The original final-permit announcement displays August 28, 2026 publication. The undated hearing-event page and current check are separate from an unverified exact permit issuance day.

Raised or recorded by North Carolina Department of Environmental Quality.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

Public concern on the record

Wiscasset Data Center (Old Ferry Road Site)

Maine · Latest recorded activity:

Read record

Light · Water use · Power and electric rates · Land use and zoning · Other

Residents raised light, water, utility-cost, land-use and public-information concerns about Wiscasset's prospective data center in preliminary October 21, 2025 minutes. In a later August 24, 2026 interview, Wiscasset Newspaper reported the inquirer's statement that he was no longer pursuing the Old Ferry Road project. That later position is not a finding about actual environmental effects or a permanent prohibition on future proposals.

Record status: Unknown. The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.

Event date
Source publication date
Not established
Disposition date
Not established
Concern sources checked

The event is the exact dated original public record. The original record supplies a document or meeting date, but its first public posting date is unknown.

Raised or recorded by Residents.

Report a correction · Link to this item

News report

Buena Vista AI Factory

California · Latest recorded activity:

Read record

Noise · Water use · Heat · Traffic and construction

Central Sierra Broadcasting reported questions about cooling water, fan noise and heat management for the Buena Vista AI Factory proposal near Ione, and truck traffic for its associated biomass power plant. The reporting distinguishes proposed computing from the separate power-plant component; these are reported questions, not measured effects or agency findings.

Record status: Unknown. The current disposition of these reported concerns is not established by this bounded review.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

A single exact interview or concern-event day is not established. The two article publication days are not substituted for an event date. Part two displays August 21, 2026; the earlier project/position article displays August 19. These are separate publication dates.

Raised or recorded by Central Sierra Broadcasting.

Report a correction · Link to this item

News report

Manse Technology Campus

Nevada · Latest recorded activity:

Read record

Water use · Land use and zoning

Nevada Current reported public water concerns and a Nye County vote restricting data centers in Pahrump's Basin 162, linking the decision to the proposed Manse Technology Campus. This is an attributed report about that basin and proposal, not an independently checked present-day court outcome, a statewide ban or a measured water finding.

Record status: Unknown. The current judicial and project outcome and the disposition of the reported water concerns are unknown in this bounded review. The historical basin-restriction report and current developer plans do not establish a final case disposition, site-specific approval or withdrawal, completed mitigation or measured water use.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The article describes a Tuesday commission vote, but an independently inspected exact vote date was not established. The event date remains unknown; the publication date is not substituted. The original report displays August 20, 2026 publication. The current developer page has no independently established first publication date; its source-check day is not a new company statement or project event.

Raised or recorded by Nevada Current.

Report a correction · Link to this item

News report

Google Project Skyway (Pine Island)

Minnesota · Latest recorded activity:

Read record

Noise · Light · Health · Water use · Power and electric rates

MPR News reported continued environmental concerns about Google's Pine Island proposal, following earlier questions about noise, light, health, water and electricity. Its later report described opposition at a company event and a court-review-related pause. These are outlet accounts; the original court order, present project outcome and actual environmental conditions were not independently verified.

Record status: Unknown. The current formal court and project disposition and the outcome of these documented concerns are unknown in this bounded review. MPR News reported a pause during judicial review in August; that is not an independently inspected current order, final project withdrawal, issued environmental approval or measured resource outcome.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The newer report describes a Wednesday event but an independently checked exact event day was not established. Event date stays unknown; the earlier scheduled injunction hearing and later reported pause are not original verified court-event dates. The current original two-project report displays August 20, 2026 publication. The separate Pine Island background report is dated February 24. Publication, company-event timing and a court ruling are distinct.

Raised or recorded by MPR News.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

News report

Google Hermantown Data Center

Minnesota · Latest recorded activity:

Read record

Noise · Light · Water use · Power and electric rates · Water quality and discharge · Wildlife, wetlands and stormwater

MPR News reported continuing questions about Google's Hermantown proposal, including noise, water and electricity use, a nearby trout stream and stormwater. It described company presentations and residents' differing reactions. These are reported concerns and plans, not an independently inspected complaint case, measured effects, completed mitigation or final agency approval.

Record status: Unknown. The later disposition of these documented concerns is unknown in this bounded original-report review. Presented design or cooling options and company mitigation plans do not establish completed work, measured noise or water outcomes, a final permit or resolution of every concern.

Event date
Not established
Source publication date
Disposition date
Not established
Concern sources checked

The reports describe several open houses and relative weekday meetings without one independently verified exact concern-event day for this item. Event date remains unknown; report publication and scheduled later reviews are separate. The current original report displays August 20, 2026 publication,with separate June 25 background reporting. Those days are outlet publication dates,not independently verified company-original,permit or court-event dates.

Raised or recorded by MPR News.

Report a correction · Link to this item

Permit and comment

Goodman Innovation Centre San Jose (NorthTown Data Center)

California · Latest recorded activity:

Read record

Water use · Water quality and discharge · Wildlife, wetlands and stormwater

Valley Water requested environmental-review analysis of water supply, flooding, shallow groundwater, stormwater and protection of the adjacent Guadalupe River for NorthTown. The agency recommended spill controls and protection of wells. Its comment requests assessment and safeguards; it does not establish a discharge, present contamination caused by the project or a permit violation.

Record status: Unknown. The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.

Event date
Source publication date
Disposition date
Not established
Concern sources checked

The retained original filing or effective order provides this exact event date. The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.

Raised or recorded by Valley Water.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

News report

Panattoni Burgin Data Center Campus

Kentucky · Latest recorded activity:

Read record

Water use · Power and electric rates · Land use and zoning

Kentucky Public Radio reported opposition to Panattoni's Burgin-area proposal at a July 30, 2026 planning hearing and later annexation discussions, including questions about water, electricity and control over farmland development. The report distinguishes a county moratorium from city proceedings. It does not establish current annexation, a final city prohibition, measured impacts or a verified project withdrawal.

Record status: Unknown. The later formal annexation, city/county applicability and proposal disposition are unknown in this bounded original-report review. A reported county moratorium or delayed city vote does not establish a permanent city ban, project withdrawal, permit denial or resolution of all resource concerns.

Event date
Source publication date
Disposition date
Not established
Concern sources checked

The original caption and article expressly identify the July 30, 2026 planning hearing/commission action. Other relative Tuesday meetings and later annexation discussion are not converted to unverified exact event dates. The original report displays August 17, 2026 publication, distinct from the July 30 reported hearing and this source check.

Raised or recorded by Kentucky Public Radio.

No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.

Report a correction · Link to this item

About this information

What public sources record about data center concerns, with the original attribution, dates and limits.

Counts describe documentation, not harm or severity. Coverage is incomplete. A missing item does not establish that no concern was raised. A resolved procedural petition does not resolve the underlying allegations.

Newest recorded activity first, using the latest known event, disposition, item-source publication or verified company-response publication date. A source-check date never moves an item up the list. Unknown activity dates are excluded when a date range is selected.

How this is tracked.

Each item is individually checked against its public source and an existing Atlas site, campus, project or exact county ID. Event, source publication, disposition and source-check dates stay separate. Unknown dates and outcomes stay unknown. Private residents speaking publicly are labeled Residents; private residents' names are not printed.

Regulator record
An agency-published inspection finding, notice, order or penalty.
Permit and comment
A permit record, public comment period or hearing notice. A notice does not establish approval.
Formal complaint
An agency-published complaint record or count, distinct from a violation finding.
Legal action
A filed action, appeal or notice of intent. Allegations and procedural rulings retain their own scope.
Public concern on the record
Public testimony, a group statement, petition, resolution or recorded letter.
News report
A reported concern attributed to the named outlet, distinct from an agency finding.

The Atlas attributes statements and does not decide who is right. Verified published company responses appear beside the item they address, with their publication basis and relationship to the record. No verified response does not establish refusal. Category counts can overlap and are never a severity ranking.

Open, pending and unknown items require a source recheck within 120 days. The due date does not advance because the website is rebuilt. County-wide items do not create site findings or map pins. The optional neutral Concerns map layer is off by default.

Report a correction. Corrections are reviewed before publication.

Water combines water use and water quality records. Category counts can overlap. The state map counts documented items in this collection, not physical sites or measured effects.

Download the records.

Download all concerns CSV Download all concerns JSON