Serverfarm Covington Data Center (Hazelbrand Road)
Read record
Air and generators
Georgia Environmental Protection Division issued air permit 4911-217-0080-S-01-0 for the VoltaGrid prime-power generation component serving ATL2 at 10835 Hazelbrand Road. The signed permit and agency narrative document a conditional air authorization, not verified operation, all local approvals or disposition of earlier construction allegations. The final agency addendum treats the two facilities as one air-permitting source while retaining separate equipment permits; this does not merge Atlas identities.
Record status: Resolved. Georgia Environmental Protection Division issued the named air permit. Resolved applies only to this permit action; the outcome of earlier construction allegations, actual operation and present compliance are not established.
- Event date
- Source publication date
- Not established
- Disposition date
- Concern sources checked
The signed original permit cover and current agency registry identify September 18, 2026 as issuance. This is not an opening or all-permit completion date. The current registry labels an issuance date. A first public posting date for this permit or its evolving narrative is not established, so publication stays unknown.
Raised or recorded by Georgia Environmental Protection Division.
No item-specific published company response was verified in the bounded source review. This does not establish that a company declined to respond.