- Status
- Construction documented by City
- Place
- Reno, Nevada
- County
- Washoe
- Type
- Data center (inventory classification)
Status context. The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Dated record.
- approved
- The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service.
Documented concerns.
- Noise, Water use, Water quality and discharge, Air and generators, Power and electric rates, Traffic and construction, Land use and zoning, HeatThird Act Nevada reported that it joined Water Over Data Alliance in raising questions about the Keystone project's cooling design, electricity, generator air, noise, construction hours and heat. Reno later published.
A documented item is a public record or report, not an Atlas finding.
Sources.
- Reviewed sourcewww.reno.gov · checked October 15, 2026
Nearby records.
Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Last checked October 24, 2026, 1 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Dated field evidence for CENTRA RNO2 (Keystone Data Center). This is not an operating recertification.