Cook Inlet Subsea-Compute & Infrastructure Hub
- Status
- Agency listed proposal
- Place
- Nikiski, Alaska
- County
- Kenai Peninsula
- Type
- Data center (inventory classification)
Status context. The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Dated record.
- announced
- Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.
- The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening.
Documented concerns.
- Noise, Heat, Water quality and discharge, Wildlife, wetlands and stormwater, OtherNational Fisherman reported fishing, conservation and borough concerns about salmon migration, marine habitat, vessel navigation, heat, noise and public participation in the DeepGreen Cook Inlet proposal. It also.
- Water quality and discharge, Noise, Heat, Land use and zoning, Wildlife, wetlands and stormwater, OtherFederal Energy Regulatory Commission recorded acceptance for filing of the DeepGreen Cook Inlet preliminary-permit application and invited comments through November 2, 2026. The notice concerns study priority for the.
A documented item is a public record or report, not an Atlas finding.
Sources.
- Reviewed sourcewww.peninsulaclarion.com · published September 14, 2026 · checked October 14, 2026
- Reviewed sourcewww.govinfo.gov · published September 4, 2026 · checked October 14, 2026
Nearby records.
Data file updated October 23, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Last checked October 23, 2026, 2 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Dated field evidence for Cook Inlet Subsea-Compute & Infrastructure Hub. This is not an operating recertification.