Texas · Data center record

Lancium Clean Campus (Crusoe / Stargate Site 1)

Status
First phase reported operating
Place
Abilene, Texas
County
Taylor
Type
Data center (inventory classification)

Status context. Crusoe September 30, 2025 release says the first phase of the Abilene Stargate campus is up and running on Oracle Cloud Infrastructure, with early workloads. Its current 2025 impact report account again describes that first phase as operational. First phase reported operating applies only to that delivered phase, not every planned building, all advertised campus capacity or a separate Microsoft Abilene campus. The release day is not the exact service commencement day. No provider role, actual capacity, opening field or project boundary is changed.

Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.

Open on the Texas mapNear me

Dated record.

  1. announced
  2. Crusoe published its first phase Abilene operational announcement on September 30, 2025, saying that phase was up and running on Oracle Cloud Infrastructure. This is the release date, not the exact first workload or opening day, and does not certify completion of the entire planned campus.

Sources.

  1. Reviewed sourcektxs.com · published March 5, 2026 · checked October 14, 2026
  2. Reviewed operator sourcewww.crusoe.ai · published September 30, 2025 · checked October 23, 2026
  3. Reviewed operator sourcewww.crusoe.ai · checked October 23, 2026

Nearby records.

Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 23, 2026, 3 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Source review for Lancium Clean Campus (Crusoe / Stargate Site 1). This is not a project milestone.

Quick answers

Questions about this record

What stage does this record report?

First phase reported operating. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Exact site not published; shown at county level. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

3 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.