Data CentersAtlas
California · Data center record

300 Holger Way Data Center (Menlo Equities conversion)

Status
City-listed planned development
Place
San Jose, California
Type
Data center (inventory classification)

Status context. San Jose describes the proposed 300 Holger Way data center use in an existing building and signed a categorical CEQA exemption on July 9, 2026. The state index posted the notice on July 16. The reviewed notice and statements do not establish that the separate special use permit was issued, tenant work began or the facility opened. The city listed planned development label applies to the proposed use only.

Filed project street reference, not a surveyed building or parcel. Officially filed project street 300 Holger Way, San Jose, CA 95134 matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction.

Open on the California mapSanta Clara CountyNear me

Dated record.

  1. approved
  2. San Jose signed a categorical CEQA exemption for the proposed 300 Holger Way reuse. This is an environmental review action, not issuance of every permit, observed tenant work or an opening.

Documented concerns.

A documented item is a public record or report, not an Atlas finding.

Sources.

  1. Reviewed sourceceqanet.lci.ca.gov · published July 16, 2026 · checked October 14, 2026
  2. Reviewed government recordfiles.ceqanet.lci.ca.gov · checked October 22, 2026
  3. Literal unique calculated street range and county geographygeocoding.geo.census.gov · checked October 23, 2026
  4. Actually viewed setting only, acquisition date unknownbasemap.nationalmap.gov · checked October 23, 2026

Nearby records.

Data file updated October 25, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 23, 2026, 4 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Source review for 300 Holger Way Data Center (Menlo Equities conversion). This is not a project milestone.

Quick answers

Questions about this record

What stage does this record report?

City-listed planned development. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Filed project street reference, not a surveyed building or parcel. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

4 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.

Nearby reviewed map references

Google 5079-5087 Disk Drive Compute Campus (North San José) · CoreSite SV2 (Milpitas) · Mission College Data Center · QTS Santa Clara 1 · Equinix SV2

Ordered by the published street or exact map references, not verified facility boundaries. County areas and approximate area references are excluded; this is not a claim about the nearest operating facilities.