Project Cannoli

Status
Site work reported
Place
Van Buren Township, Michigan
Company
Panattoni
End user
Google (announced participant)
Type
Data center development
Power
1,000 MW original maximum utility-service request (March 17, 2026)

Status context. WEMU's October 15 report says preliminary construction has begun. Site work is reported, not independently inspected data-hall construction, delivered capacity or operation. The developer's proposed-campus wording is retained; the primary final-plan decision and conditions have not been read.

Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.

Open on the Michigan mapWayne CountyNear me

Dated record.

  1. approved
  2. announced
  3. approved
  4. MPSC conditionally approved DTE and Google electricity contracts in U-22058. Acceptance and other conditions apply; this is a utility-contract milestone, not local siting or construction permission, completed obligations, energized service or operation.
  5. Google announced a Michigan data-center/energy collaboration and said it was evaluating Van Buren Township. The later county statement identifies Cannoli; the date is not final-plan approval, site-work commencement or 2700 MW of site IT capacity.
  6. Van Buren Township Planning Commission granted Project Cannoli preliminary site plan approval with conditions, 5 to 2. This is a preliminary planning milestone, not final plan approval, an issued building permit, satisfied conditions or operation.

Documented concerns.

A documented item is a public record or report, not an Atlas finding.

Sources.

  1. Reviewed sourcevbtmi.gov · checked October 14, 2026
  2. Developer Project Cannoli design and proposed water supplierwww.panattoni.com · checked October 16, 2026
  3. Wayne County public statement, extracted text viewwww.waynecountymi.gov · published October 1, 2026 · checked October 16, 2026
  4. Michigan development and grid-resource announcementblog.google · published March 17, 2026 · checked October 16, 2026
  5. Current Google location directory; flags are not status proofwww.datacenters.google · checked October 16, 2026
  6. WEMU reporting of preliminary work and a plan votewww.wemu.org · published October 15, 2026 · checked October 16, 2026
  7. February 11, 2026 planning minutes, page 20: preliminary approval with conditionsvbtmi.gov · checked October 16, 2026
  8. October 14, 2026 agenda packet; August staff reviews and proposed final plansvbtmi.gov · checked October 16, 2026
  9. Posted development agreement; blank developer and township signature pagesvbtmi.gov · checked October 16, 2026
  10. Planning commission document index checked October 16, 2026vbtmi.gov · checked October 16, 2026
  11. October 1, 2026 MPSC order U-22058-0187; operative provisions pages 137 to 141mi-psc.my.site.com · published October 1, 2026 · checked October 16, 2026
  12. March 17, 2026 original DTE application/testimony; maximum requested load and adjustable ramp, PDF page 10mi-psc.my.site.com · published March 17, 2026 · checked October 16, 2026

Nearby records.

Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 16, 2026, 12 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Source review for Project Cannoli. This is not a project milestone.

Quick answers

Questions about this record

What stage does this record report?

Site work reported. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Exact site not published; shown at county level. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

12 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.