Serverfarm Covington Data Center (Hazelbrand Road)
- Status
- Status unclear
- Place
- Covington, Georgia
- County
- Newton
- Company
- Serverfarm
- Type
- Data center (inventory classification)
Status unclear means the sources listed below do not establish the current stage.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Documented concerns.
- Air and generatorsGeorgia Environmental Protection Division issued air permit 4911-217-0080-S-01-0 for the VoltaGrid prime-power generation component serving ATL2 at 10835 Hazelbrand Road. The signed permit and agency narrative document.
- Air and generatorsGeorgia Public Broadcasting reported that Georgia EPD warned VoltaGrid about likely air-rule violations and a construction pause at the generation project serving Serverfarm in Covington. This is the outlet's account.
- Air and generatorsSouthern Environmental Law Center requested an investigation and enforcement action concerning alleged construction before air permits at VoltaGrid and the adjacent Serverfarm ATL2 development, on behalf of itself.
- Air and generators, Power and electric ratesGeorgia Environmental Protection Division issued air permit 7374-217-0079-S-01-0 for the ATL2 data center emergency generators at 10835 Hazelbrand Road. The signed permit and agency narrative document a conditional air.
A documented item is a public record or report, not an Atlas finding.
Sources.
- Reviewed sourcewww.gpb.org · checked October 15, 2026
- Reviewed source contextwww.selc.org · checked October 17, 2026
- Reviewed operator sourcewww.serverfarmllc.com · checked October 23, 2026
Nearby records.
Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Last checked October 23, 2026, 3 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Source review for Serverfarm Covington Data Center (Hazelbrand Road). This is not a project milestone.