Data CentersAtlas
Texas · Data center record

Soluna Project Annie

Status
Listed proposal
Place
Paris, Texas
County
Lamar
Company
Soluna
Type
Data center (inventory classification)

Status context. The current original Soluna project listing identifies Annie as a planned Bitcoin and AI computing development. Its June 9, 2026 update says it is being developed for a potential customer, with capital formation and modular construction design activities commenced and interconnection studies nearing completion. Design activity is not an accomplished physical construction start. The current page Status value is empty and its operating statistics heading supplies no independent service value for Annie. The inherited Paris geography and differing advertised quantities are not certified or changed.

Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.

Open on the Texas mapNear me

Dated record.

  1. announced
  2. Soluna published its monthly update on June 9, 2026 and described Annie development for a potential customer, with capital formation and modular construction design underway. This dates the report and design work, not a physical construction start or computing operation.

Sources.

  1. Reviewed sourcewww.solunacomputing.com · checked October 15, 2026
  2. Reviewed operator sourcewww.solunacomputing.com · checked October 23, 2026
  3. Reviewed operator sourcewww.solunacomputing.com · published June 9, 2026 · checked October 23, 2026

Nearby records.

Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 23, 2026, 3 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Source review for Soluna Project Annie. This is not a project milestone.

Quick answers

Questions about this record

What stage does this record report?

Listed proposal. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Exact site not published; shown at county level. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

3 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.