Data CentersAtlas
New Mexico · Data center record

Stargate Project Jupiter

Status
Company reported construction
Place
Santa Teresa, New Mexico
County
Dona Ana
Company
Stargate
Type
Data center (inventory classification)

Status context. The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.

Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.

Open on the New Mexico mapNear me

Dated record.

  1. announced
  2. Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation.

Documented concerns.

A documented item is a public record or report, not an Atlas finding.

Sources.

  1. Reviewed sourceelpasomatters.org · checked October 15, 2026
  2. Reviewed sourcewww.oracle.com · checked October 15, 2026

Nearby records.

Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 24, 2026, 2 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Stargate Project Jupiter: reviewed status evidence, reviewed evidence.

Quick answers

Questions about this record

What stage does this record report?

Company reported construction. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Exact site not published; shown at county level. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

2 distinct public source links are retained for this record. Source 1 Source 2 Compilation dated October 26, 2026. Record data and source links.