Muskie Data Campus
- Status
- Proposed
- Place
- near Ashland (unincorporated; EastPark off I-64, about 12 miles from Ashland), Kentucky
- County
- Boyd, Greenup
- Company
- TeraWulf Inc. (Nasdaq: WULF); site assembled by Industrial Equity Partners (IEP) from the Northeast Kentucky Regional Industrial Park Authority (EastPark board)
- End user
- Undisclosed AI/HPC tenant (TeraWulf builds and owns buildings; tenant brings servers)
- Type
- hyperscale AI
- Utility
- Kentucky Power (AEP), Industrial General Service large-load tariff; PJM
- Power
- first phase 500 MW, up to 1,000 MW
- Water
- Ashland supply proposed; source water, cooling circuit and operational consumption need a dedicated current technical record
- Jobs
- construction: Around 1,000 at peak (TeraWulf VP Pace Ralli), permanent: 80-100 in Phase 1, excluding tenant jobs
- Incentives
- Operator proposes winter bill credits and bearing project power costs, subject to PSC approval.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Dated record.
- Kentucky Power asks landowners for route feedback by this date
- Kentucky Power open house on Muskie transmission line routes (scheduled)
- Amended Kentucky Power ESA (executed Oct 1) doubles contracted capacity to 1 GW, moves phase 2 to 2029, adds 100 million dollars bill credits (PSC approval required)
- Q2 earnings call: CEO Paul Prager says Muskie could expand to as much as 2 GW
- Greenup County moratorium adopted, exempting industrial parks/EastPark; Boyd County follows July 21, 2026 with EastPark exemption
Sources.
- investors.terawulf.cominvestors.terawulf.com
- www.sec.govwww.sec.gov
- www.dailyindependent.comwww.dailyindependent.com
- www.dailyindependent.comwww.dailyindependent.com
Nearby records.
Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Review date unrecorded, 4 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Dated source for Muskie Data Campus. This is not a project milestone.