Data CentersAtlas
North Carolina · Data center record

Terra Nexus Rockingham Data Center (Old Cheraw Highway)

Status
Listed proposal
Place
Rockingham, North Carolina
County
Richmond
Type
Data center (inventory classification)

Status context. The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.

Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.

Open on the North Carolina mapNear me

Sources.

  1. Reviewed sourcewww.yourdailyjournal.com · published August 13, 2026 · checked October 14, 2026
  2. Reviewed government recordimg1.wsimg.com · checked October 23, 2026
  3. Reviewed government recordgorockingham.com · checked October 23, 2026

Nearby records.

Data file updated October 25, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 23, 2026, 3 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Terra Nexus Rockingham Data Center (Old Cheraw Highway): reviewed status evidence, source links, reviewed evidence.

Quick answers

Questions about this record

What stage does this record report?

Listed proposal. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Exact site not published; shown at county level. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

3 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.