CloudHQ MSP Campus (Chaska)
- Status
- Listed proposal
- Place
- Chaska, Minnesota
- County
- Carver
- Type
- Data center (inventory classification)
Status context. The current original City CloudHQ page labels the development proposed and describes preliminary approval in October 2024, with no final application and no timeline for final review. This supports a listed proposal within the City account. Environmental review, conditional use and preliminary planning steps do not establish construction or computing operation. A relative forecast about a power study is not converted to an exact future date. City technical assurances about planned noise, cooling and electricity remain prospective rather than measured facility performance.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Sources.
- Reviewed sourcewww.chaskamn.gov · checked October 14, 2026
Nearby records.
Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Last checked October 23, 2026, 1 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Dated field evidence for CloudHQ MSP Campus (Chaska). This is not an operating recertification.



