Data CentersAtlas
Washington · Data center record

Microsoft MWH Data Center

Status
Status unclear
Place
Quincy, Washington
Company
Microsoft
Type
Data center (inventory classification)

Status unclear means the sources listed below do not establish the current stage.

Approximate source parcel reference, not a roof or complete campus. Approximate calculated center of complete Grant County source parcel 313769000, independently joined to the original state computing street 1515 Port Industrial Parkway, Quincy, WA 98848. The literal Census query returns zero and is retained. One source parcel does not select a surveyed roof, legal title or complete campus. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction.

Open on the Washington mapGrant CountyNear me

Dated record.

  1. approved
  2. Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional emergency engine fuel option at Microsoft MWH. The order concerns the existing facility and a fuel option. It is not an original opening, a new construction start or proof of actual fuel use.

Sources.

  1. Reviewed sourceecology.wa.gov · checked October 14, 2026
  2. Reviewed government recordecology.wa.gov · checked October 23, 2026
  3. Reviewed operator sourcelocal.microsoft.com · checked October 23, 2026
  4. Original county GIS route and published organization identitywww.grantcountywa.gov · checked October 23, 2026
  5. Complete municipal address points, coordinates not adoptedservices2.arcgis.com · checked October 23, 2026
  6. Complete exact joined source parcel polygonservices2.arcgis.com · checked October 23, 2026
  7. Complete literal original street query returns zerogeocoding.geo.census.gov · checked October 23, 2026
  8. Actually viewed source setting, acquisition date unknownimagery.nationalmap.gov · checked October 23, 2026

Nearby records.

Data file updated October 24, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction

Know of a missing project?

Send its name, location and a public source. Submissions are checked before a record changes.

Suggest a project or correction

Last checked October 24, 2026, 8 linked sources. Review dates do not certify current operation or every field. Corrections and record history

Updated . What changed: Microsoft MWH Data Center: reviewed map reference, location limits, reviewed evidence.

Quick answers

Questions about this record

What stage does this record report?

Status unclear. This is the sourced Atlas label; it does not independently certify current operation. Compilation dated October 26, 2026. Record data and source links.

How precise is the mapped location?

Approximate source parcel reference, not a roof or complete campus. A map reference does not independently certify a parcel, roof or facility boundary. Compilation dated October 26, 2026. Record data and source links.

Where can I review the evidence?

8 distinct public source links are retained for this record. Source 1 Source 2 Source 3 Compilation dated October 26, 2026. Record data and source links.