Stargate Lighthouse Campus
- Status
- Reported construction
- Place
- Port Washington, Wisconsin
- County
- Ozaukee
- Company
- Stargate
- Type
- Data center (inventory classification)
Status context. The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.
Exact site not published; shown at county level. The dot is placed inside the county for the map and is not the site, its address or a parcel.
Dated record.
- announced
- The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation.
Documented concerns.
- Noise, Light, Water use, Power and electric rates, Traffic and construction, Land use and zoningWisconsin Public Radio reported water, electricity, noise and transmission-route questions at a September 10, 2026 community event for Port Washington's Lighthouse campus. Earlier reporting described.
A documented item is a public record or report, not an Atlas finding.
Sources.
- Reviewed sourcevantage-dc.com · published October 22, 2025 · checked October 14, 2026
- Reviewed sourcewww.revenue.wi.gov · published June 25, 2026 · checked October 14, 2026
- Reviewed operator sourcevantage-dc.com · checked October 23, 2026
- Reviewed operator sourcewww.weitz.com · published December 18, 2025 · checked October 23, 2026
Nearby records.
Data file updated October 25, 2026. Fields keep their own sources and dates; unknown details stay unknown. Method · Report a correction
Know of a missing project?
Send its name, location and a public source. Submissions are checked before a record changes.
Last checked October 23, 2026, 4 linked sources. Review dates do not certify current operation or every field. Corrections and record history
Updated . What changed: Stargate Lighthouse Campus: reviewed status evidence, source links, reviewed evidence.