Historical record, Permit issued. Checked: October 28, 2026.

Evidence applies only to the subjects and dates in the linked sources. State context does not assign a tariff, permit or quantity to every facility.

Open the Georgia data center map.

Sourced findings.

  • Amazon ATL068 and ATL078, Lithia Springs

    One dated permit jointly covers two colocated campuses. 188 is a combined permitted generator inventory, not observed operation or a per building count.

    Georgia Environmental Protection Division. Source: August 18, 2025. Checked: October 23, 2026.

    Full source details load when opened.

  • Amazon ATL089 campus, Covington, issued June 2026 generator permit

    One actual dated permit authorizes 321 emergency generators. Inventory, conditional operating and reporting requirements, narrative conflicts and actual outcomes remain separate. No observed operation or statewide count completeness implied.

    Georgia Environmental Protection Division. Source: June 29, 2026. Checked: October 24, 2026.

    Full source details load when opened.

  • Amazon ATL057 dated permit and separate equipment plan

    Issued September 2023 permit terms and a separate seven unit narrative plan. The signed instrument gives no numerical inventory. Planned equipment, future phases, rolling operating limits and unknown actual outcomes remain distinct.

    Georgia Environmental Protection Division. Source: September 21, 2023. Checked: October 24, 2026.

    Full source details load when opened.

  • DCB Atlanta East, Conyers, dated six generator permit

    Dated February 2025 six generator issued authorization with separate state and federal conditions, narrative calculation assumptions, future installation plan and explicit source differences. Permit is not operation.

    Georgia Environmental Protection Division. Source: February 26, 2025. Checked: October 24, 2026.

    Full source details load when opened.

  • DCB Atlanta West, Douglasville, dated 76 generator and fuel limit permit

    Signed January 2026 authorization, facilitywide rolling diesel fuel ceiling, separate hour conditions and completed public comment addendum. Narrative calculation and chronology conflicts retained. Permit is not operation.

    Georgia Environmental Protection Division. Source: January 28, 2026. Checked: October 24, 2026.

    Full source details load when opened.

  • QTS Fayetteville dated 235 generator amendment and later proposed addition

    Historical generator source inventory and shared generator/fire pump fuel cap. Pump wording, application chronology and later 2026 proposal remain separate. Permitted is not installed or operating.

    Georgia Environmental Protection Division. Source: October 17, 2024. Checked: October 24, 2026.

    Full source details load when opened.

  • Microsoft FTY01 dated 21 generator building 3 amendment

    Historical authorization for an additional building 3 group, with strict annual operating condition, separate calendar and rolling notification clocks, narrative source conflicts and unknown actual operation. The equipment count is not an aggregate campus inventory.

    Georgia Environmental Protection Division. Source: April 15, 2025. Checked: October 24, 2026.

    Full source details load when opened.

  • Equinix Atlanta dated permit for 149 generators and separate fire pump

    Issued June 2026 air permit with conditional construction and operation, distinct engine table limits and retained source reference differences. Permission is not installed inventory, actual emissions, actual fuel or current operation.

    Georgia Environmental Protection Division. Source: June 30, 2026. Checked: October 24, 2026.

    Full source details load when opened.

  • Microsoft CCO06 dated 121 generator replacement permit

    Dated June 2025 air construction authorization, distinct calendar and rolling clocks, replacement permit and startup triggered application duty. Permitted is not operating.

    Georgia Environmental Protection Division. Source: June 4, 2025. Checked: October 24, 2026.

    Full source details load when opened.

  • Georgia historical2023 electricity-generation emissions

    EPA eGRID2023 revision2 state electricity-generation emissions context,ST23 worksheet. Historical2023,not current2026 conditions or data center facility emissions. Annual NOx,SO2 andCO2 totals in source tons are distinct from source-reported total output rates in lb/MWh;CO2 is not CO2 equivalent. Annual net generation is MWh,not installed capacity or customer use. Rates are not marginal emissions,ambient concentrations,health effects or emissions factors allocated to a data center. No tons-to-tonnes conversion,rate recomputation,facility join or causal data center inference. State generation context does not establish the mix delivered to consumers. Puerto Rico source row is outside this51state/DC review,not absence.

    U.S. Environmental Protection Agency. Source: Publication date not stated. Checked: October 27, 2026.

    Full source details load when opened.

  • Georgia historical power and useful thermal emissions2025 and2024

    EIA Table9.5 historical state2025 and2024 emissions estimates from energy consumption at conventional power and combined-heat-and-power plants. Includes electricity generation AND production of useful thermal output,not electricity-only emissions. Source unit is thousand metric tons,not eGRID source tons,pounds,CO2equivalent or emission intensity. Source CO2,SO2 and NOx are distinct pollutants,not summed as one climate measure. Displayed zero values may represent small values rounded to zero;no absence or zero-emissions certification. Retain displayed HTML precision;source says Excel cells provide additional precision,not adopted here. No direct eGRID trend or data center allocation,marginal emissions,ambient concentration,health risk,permit compliance,current2026 activity or Native facility joins.

    U.S. Energy Information Administration. Source: October 21, 2026. Checked: October 28, 2026.

    Full source details load when opened.

Explore county records.

Explore data center records.

These records are in Georgia. State evidence does not establish an individual record match.